Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
TT330N16KOFTIMHPSA1
Infineon
SCR MODULE 1600V 520A MODULE

MPQ: 3

Lead Time: 9-12Days

-- --
2000
Total: $
CGA5L3X8R2A334K160AE
Tdk
CAP CER 0.33UF 100V X8R 1206

MPQ: 2000

Lead Time: 9-12Days

-- --
6900
Total: $
ETD420N22P60HPSA1
Infineon
THYR / DIODE MODULE DK

MPQ: 2

Lead Time: 9-12Days

-- --
9400
Total: $
12103C334K4T2A
Kyocera Avx Components
CAP CER 0.33UF 25V X7R 1210

MPQ: 4000

Lead Time: 9-12Days

-- --
4500
Total: $
ETD480N22P60HPSA1
Infineon
THYR / DIODE MODULE DK

MPQ: 2

Lead Time: 9-12Days

-- --
5600
Total: $
ETT420N22P60HPSA1
Infineon
THYR / DIODE MODULE DK

MPQ: 2

Lead Time: 9-12Days

-- --
6500
Total: $
ETT480N22P60HPSA1
Infineon
THYR / DIODE MODULE DK

MPQ: 2

Lead Time: 9-12Days

-- --
4600
Total: $
C1210C225M8VACTU
Kemet(Yageo)
CAP CER 2.2UF 10V Y5V 1210

MPQ: 4000

Lead Time: 9-12Days

-- --
900
Total: $
C1206C333JARACTU
Kemet(Yageo)
CAP CER 0.033UF 250V X7R 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
7100
Total: $
C1206C273JARACTU
Kemet(Yageo)
CAP CER 0.027UF 250V X7R 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
6200
Total: $
C0805C200G5GALTU
Kemet(Yageo)
CAP CER 20PF 50V NP0 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
1900
Total: $
C0805C122G8GACTU
Kemet(Yageo)
CAP CER 1200PF 10V C0G/NP0 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
8700
Total: $
C0603T473K5RALTU
Kemet(Yageo)
CAP CER 0.047UF 50V X7R 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
6000
Total: $
C0603C300D3GACTU
Kemet(Yageo)
CAP CER 30PF 25V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
3500
Total: $
C0603C240D5GACTU
Kemet(Yageo)
CAP CER 24PF 50V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
2000
Total: $
C0603C130C3GACTU
Kemet(Yageo)
CAP CER 13PF 25V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
7300
Total: $
C0603C100C5GALTU
Kemet(Yageo)
CAP CER 10PF 50V NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
900
Total: $
STT800N16P55XPSA1
Infineon
SCR MODULE POWERBLOCK PS55-1

MPQ: 1

Lead Time: 9-12Days

-- --
9400
Total: $
TD600N16KOFTIMHPSA1
Infineon
SCR MODULE 1600V 1050A MODULE

MPQ: 2

Lead Time: 9-12Days

-- --
900
Total: $
STT1400N16P55XPSA1
Infineon
SCR MODULE POWERBLOCK PS55-1

MPQ: 1

Lead Time: 9-12Days

-- --
0
Total: $
  • 1
  • 809
  • 810
  • 811
  • 812
  • 813
  • 6655
Go to