Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
CC1206JKX7RDBB102
Yageo
MLCC 2kV ±5% 1nF X7R 1206

Lead Time: 9-12Days

-- --
8300
Total: $
RC2512FK-7W75RL
Yageo
2W 75Ω ±1% 2512

Lead Time: 9-12Days

-- --
7100
Total: $
CC0402GRNPO9BN102
Yageo
0402

Lead Time: 9-12Days

-- --
2700
Total: $
RC1210FR-07220RL
Yageo
500mW 220Ω ±1%

Lead Time: 9-12Days

-- --
6500
Total: $
RT0402BRD071K33L
Yageo
RES SMD 1.33KOHM 0.1% 1/16W 0402

Lead Time: 9-12Days

-- --
3500
Total: $
RT0402BRD075K23L
Yageo
RES SMD 5.23KOHM 0.1% 1/16W 0402

Lead Time: 9-12Days

-- --
3700
Total: $
CC1206JRNPOBBN101
Yageo
MLCC 500V ±5% 100pF NP0 1206

Lead Time: 9-12Days

-- --
3500
Total: $
CQ0402ARNPO9BN3R0
Yageo
MLCC 50V 3pF NP0 0402

Lead Time: 9-12Days

-- --
900
Total: $
PE1206FRF7W0R02L
Yageo
/ 500mW 20mΩ ±1% 1206

Lead Time: 9-12Days

-- --
3700
Total: $
CC0603JRX7R8BB474
Yageo
MLCC 25V ±5% 470nF X7R 0603

Lead Time: 9-12Days

-- --
6100
Total: $
SS310F
Jingdao
850mV@3A 100V 300uA@100V 3A SMAF

Lead Time: 9-12Days

-- --
300
Total: $
AC0603KRX7R0BB223
Yageo
MLCC 100V ±10% 22nF X7R

Lead Time: 9-12Days

-- --
9500
Total: $
CS0603KRX7R9BB103
Yageo
MLCC 50V ±10% 10nF X7R 0603

Lead Time: 9-12Days

-- --
6300
Total: $
MFR2WSJT-73-1M
Yageo
2W 1MΩ ±5% ,D4.5xL11.5mm

Lead Time: 9-12Days

-- --
900
Total: $
74ACT14SCX
Onsemi
-IC-6---14-SOIC

Lead Time: 9-12Days

-- --
5100
Total: $
RC0805JR-0727ML
Yageo
27-MOhms-±5%-0.125W-1-8W--08052012--

Lead Time: 9-12Days

-- --
6500
Total: $
CC1206JKNPOCBN561
Yageo
MLCC 1kV ±5% 560pF NP0 1206

Lead Time: 9-12Days

-- --
2500
Total: $
CC0402JRX7R9BB202
Yageo
MLCC 50V ±5% 2nF X7R 0402

Lead Time: 9-12Days

-- --
7900
Total: $
PSPMAA1265H-151M-IGP
Prod
150uH ±20% SMD-2P,12.8x13.2mm

Lead Time: 9-12Days

-- --
4900
Total: $
25121WF250MT4E
Uni-Royal
1W 25mΩ ±1% 2512

Lead Time: 9-12Days

-- --
7100
Total: $
  • 1
  • 6
  • 7
  • 8
  • 9
  • 10
  • 6854
Go to