Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
X161032768KLD2SI
Yxc
32.768kHz 9pF ±20ppm

Lead Time: 9-12Days

-- --
8900
Total: $
X252024MOB4SI
Yxc
X252024MOB4SI

Lead Time: 9-12Days

-- --
9900
Total: $
XD393
Xinluda

Lead Time: 9-12Days

-- --
5300
Total: $
AMS1117-2.5
Slkor
LDO AMS1117-2.5 SOT-223-3

Lead Time: 9-12Days

-- --
2700
Total: $
BZT52C2V7
Jscj
2.7V 2.5V~2.9V 20uA@1V

Lead Time: 9-12Days

-- --
9900
Total: $
CS1A471M-CRE77
Swst
10V ±20% 470uF 6.3mm

Lead Time: 9-12Days

-- --
1100
Total: $
CS1C471M-CRF10
Swst
16V ±20% 470uF 8mm

Lead Time: 9-12Days

-- --
2700
Total: $
CS1C221M-CRE77
Swst
16V ±20% 220uF 6.3mm

Lead Time: 9-12Days

-- --
7900
Total: $
CS1A102M-CRF10
Swst
10V 1000uF

Lead Time: 9-12Days

-- --
8500
Total: $
CS1H101M-CRF10
Swst
50V ±20% 100uF 8mm

Lead Time: 9-12Days

-- --
4500
Total: $
GD5F2GM7UEYIGR
Gigadevice
NAND

Lead Time: 9-12Days

-- --
900
Total: $
LBZT52C2V7T1G
Lrc
2.7V 2.5V~2.9V 20uA

Lead Time: 9-12Days

-- --
900
Total: $
LESD8L3.3CT5G
Lrc
VRWM:3.5V IR:0.05μA VBR:4.8V

Lead Time: 9-12Days

-- --
6900
Total: $
NAU88C10YG
Nuvoton

Lead Time: 9-12Days

-- --
7900
Total: $
SI2310AHE3-TP
Micro Commercial Components
N-Channel Enhancement Mode Field Effect Transistor Automotive

Lead Time: 9-12Days

-- --
1500
Total: $
SGM2036S-3.3XXDH4G/TR
Sgmicro
LDO SGM2036S-3.3XXDH4G/TR

Lead Time: 9-12Days

-- --
8100
Total: $
ULN2803G-P20-R
Unisonic(Utc)

Lead Time: 9-12Days

-- --
1900
Total: $
U74AHC1G02G-AE5-R
Unisonic(Utc)

Lead Time: 9-12Days

-- --
8100
Total: $
2SC554
Jscj
2SC554

Lead Time: 9-12Days

-- --
5500
Total: $
2SD882SG-P-AB3-R
Unisonic(Utc)
BJT 500mW 30V 3A NPN

Lead Time: 9-12Days

-- --
7700
Total: $
  • 1
  • 772
  • 773
  • 774
  • 775
  • 776
  • 6854
Go to