Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
67-21SUBC/S400-A4/TR8
Everlight
3528

Lead Time: 9-12Days

-- --
8700
Total: $
CD74HCT365M96
Texas Instruments
// CD74HCT365M96 SOIC-16

Lead Time: 9-12Days

-- --
9700
Total: $
CD74ACT05M96
Texas Instruments
-IC-6---14-SOIC

Lead Time: 9-12Days

-- --
300
Total: $
ZMM39V
Ruilon
39V 37V~41V 500mW SOD-80

Lead Time: 9-12Days

-- --
8100
Total: $
1206W4F5901T5E
Uni-Royal

Lead Time: 9-12Days

-- --
4100
Total: $
0251012.NRT1L
Littelfuse
—— 32V 12A

Lead Time: 9-12Days

-- --
9300
Total: $
TMC6100-LA
Analog Devices
IC 37-QFN-EP7x7

Lead Time: 9-12Days

-- --
3100
Total: $
GBU25M
Lrc
1.1V 1kV 5uA 25A GBU

Lead Time: 9-12Days

-- --
500
Total: $
HS2GA
Ruilon

Lead Time: 9-12Days

-- --
4300
Total: $
L1SS400GT1G
Lrc
1.2V 80V 100mA SOD-723

Lead Time: 9-12Days

-- --
3300
Total: $
L2SC1623QLT1G
Lrc
BJT 225mW 50V 150mA NPN SOT-23

Lead Time: 9-12Days

-- --
6700
Total: $
MC9721
Gatemode

Lead Time: 9-12Days

-- --
7900
Total: $
1210W2J0112T5E
Uni-Royal

Lead Time: 9-12Days

-- --
3700
Total: $
17-215/G6C-BM1N2L/4T
Everlight

Lead Time: 9-12Days

-- --
7300
Total: $
19-213/Y2C-FN2P2VZ/5T
Everlight

Lead Time: 9-12Days

-- --
4500
Total: $
1206W4F1272T5E
Uni-Royal
1206 12.7KΩ ±1% 1/4W

Lead Time: 9-12Days

-- --
4700
Total: $
17-215/T7D-JU1V1E/4T
Everlight
17-215/T7D-JU1V1E/4T 0805

Lead Time: 9-12Days

-- --
4900
Total: $
19-217/BHC-ZM1N2TY/6T
Everlight

Lead Time: 9-12Days

-- --
8900
Total: $
27-21UYC/S530-A2/TR8
Everlight

Lead Time: 9-12Days

-- --
5900
Total: $
ABS10
Lrc
950mV 1kV 5uA 1A ABS

Lead Time: 9-12Days

-- --
5100
Total: $
  • 1
  • 75
  • 76
  • 77
  • 78
  • 79
  • 6854
Go to