Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
XC6702D501PR-G
Torex Semiconductor Ltd.
LDO 36V 300mA 5V

Lead Time: 9-12Days

-- --
3500
Total: $
XC6901D501MR-G
Torex Semiconductor Ltd.
PMIC---1--200mA-SOT-25-5

Lead Time: 9-12Days

-- --
5100
Total: $
X10B25L11T
Xkb Connectivity
FPC 1.0mm H=2.5mm 11P

Lead Time: 9-12Days

-- --
4700
Total: $
T2N7002AK-ES
Elecsuper
MOSFET 200mW 60V 300mA 1N

Lead Time: 9-12Days

-- --
9300
Total: $
TC211B106K016Y
Sunlord
16V ±10% 10uF 2.8Ω@100kHz

Lead Time: 9-12Days

-- --
4500
Total: $
TC7SET17FU,LJ(CT
Toshiba
Schmitt Trigger Buffer 1-CH Non-Inverting CMOS Automotive AEC-Q100 5-Pin USV

Lead Time: 9-12Days

-- --
2300
Total: $
TP358A-SR
3Peak

Lead Time: 9-12Days

-- --
8300
Total: $
TPF110-CR
3Peak

Lead Time: 9-12Days

-- --
300
Total: $
TPH2503-TR
3Peak
250MHz, Precision, Rail‐to‐Rail I/O, CMOS

Lead Time: 9-12Days

-- --
2500
Total: $
TP2272-TSR
3Peak

Lead Time: 9-12Days

-- --
8100
Total: $
EPZ1005D121-2R0T
Sunlord
120Ω@100MHz 50mΩ ±25% 2A

Lead Time: 9-12Days

-- --
4300
Total: $
IRLTS6342TRPBF
Infineon
MOSFET 2W 30V 8.3A 1N

Lead Time: 9-12Days

-- --
9500
Total: $
SST26VF080A-104I/SN
Microchip
--IC-8Mb-1M-x-8-SPI--I-O-104MHz-8-SOIC

Lead Time: 9-12Days

-- --
2700
Total: $
TLP291(YH-TP,SE(T
Toshiba
PHOTOCOUPLER GaAs IRED and

Lead Time: 9-12Days

-- --
2100
Total: $
TLP2303(TPL,E(T
Toshiba
TLP2303TPL,ET

Lead Time: 9-12Days

-- --
8500
Total: $
TLP293(BL,E(T
Toshiba
Photocoupler, Tr, 2.3mm, DC,

Lead Time: 9-12Days

-- --
500
Total: $
TLP293(BLL-TPL,E(T
Toshiba
Optocoupler Transistor 80V 200-400%

Lead Time: 9-12Days

-- --
700
Total: $
TLP293(Y-TPL,E(T
Toshiba
TLP293Y-TPL,ET SOP-4-1.27mm

Lead Time: 9-12Days

-- --
3100
Total: $
TPT1042Q-SO1R-S
3Peak
1/1 CANbus

Lead Time: 9-12Days

-- --
7500
Total: $
TPV706TL1-SR
3Peak

Lead Time: 9-12Days

-- --
7700
Total: $
  • 1
  • 749
  • 750
  • 751
  • 752
  • 753
  • 6854
Go to