Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
CC0805JRNPOBBN221
Yageo
MLCC 500V ±5% 220pF NP0

Lead Time: 9-12Days

-- --
9100
Total: $
CC0805FRNPO9BN560
Yageo
CAP CER 56PF 50V NPO

Lead Time: 9-12Days

-- --
6500
Total: $
MUSES02
Nisshinbo Micro Device Inc.

Lead Time: 9-12Days

-- --
5100
Total: $
RBR5LAM60ATR
Rohm Semiconductor
550mV@5A 60V 5A

Lead Time: 9-12Days

-- --
9700
Total: $
SMAJ180A
Jingdao
TVS SMAJ180A 180V SMADO-214AC

Lead Time: 9-12Days

-- --
6100
Total: $
STD80N240K6
Stmicroelectronics
ST

Lead Time: 9-12Days

-- --
8900
Total: $
S5MB-13
Diodes Incorporated
Standard Recovery Rectifier SMB T&R

Lead Time: 9-12Days

-- --
700
Total: $
SGM7SZ126YN5G/TR
Sgmicro
SGM7SZ126YN5G/TR

Lead Time: 9-12Days

-- --
8300
Total: $
2SC6026MFVGR,L3F(B
Toshiba
2SC6026MFVGR,L3F(B

Lead Time: 9-12Days

-- --
6100
Total: $
MAX98357AETE+T
Analog Devices
IC 1- D

Lead Time: 9-12Days

-- --
8900
Total: $
RT5789BGQUF
Richtek
-IC--8-UDFN

Lead Time: 9-12Days

-- --
700
Total: $
RT9266GE
Richtek
DC-DC 2V~6V 2V~7V

Lead Time: 9-12Days

-- --
1100
Total: $
RT9187GQV
Richtek
1A, Ultra-Low Dropout, Ultra-Fast CMOS LDO

Lead Time: 9-12Days

-- --
3300
Total: $
RTQ2103AGSP-QA
Richtek
IC 0.45V 1 2A 8-SOIC0.154",3.90mm

Lead Time: 9-12Days

-- --
7300
Total: $
RT6160AWSC
Richtek
Low Quiescent, High Efficiency 3A Buck-Boost Converter with I2C

Lead Time: 9-12Days

-- --
7300
Total: $
RT5762CHGH6F
Richtek
DC-DC 2.5V~6V 600mV~6V

Lead Time: 9-12Days

-- --
6500
Total: $
SSM3J15FV,L3F(B
Toshiba
SSM3J15FV,L3F(B

Lead Time: 9-12Days

-- --
6700
Total: $
SSM6L09FU(TE85L,F)
Toshiba
MOSFET 300mW 30V 200mA;400mA 1N+1P

Lead Time: 9-12Days

-- --
9500
Total: $
SSM3J132TU,LF(B
Toshiba
SSM3J132TU,LF(B

Lead Time: 9-12Days

-- --
9900
Total: $
SSM3K335R,LF(B
Toshiba
Small Low ON resistance

Lead Time: 9-12Days

-- --
6900
Total: $
  • 1
  • 742
  • 743
  • 744
  • 745
  • 746
  • 6854
Go to