Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
BZT52C27S
Yangjie
27V 200mW 100nA@18.9V 80Ω

Lead Time: 9-12Days

-- --
2300
Total: $
SR5100
Yangjie
850mV@5A 100V 5A

Lead Time: 9-12Days

-- --
2900
Total: $
CK1V471M-CRG10
Swst
35V ±20% 470uF 10mm

Lead Time: 9-12Days

-- --
3300
Total: $
SMBJ10CA
Yangjie

Lead Time: 9-12Days

-- --
3500
Total: $
CK1A221M-CRE54
Swst
10V ±20% 220uF 6.3mm

Lead Time: 9-12Days

-- --
3900
Total: $
CS1V471M-CRG10
Swst
35V ±20% 470uF 10mm

Lead Time: 9-12Days

-- --
4300
Total: $
S210Q
Yangjie

Lead Time: 9-12Days

-- --
4700
Total: $
BAV99WT
Yangjie
1 1.25V@150mA 100V 150mA

Lead Time: 9-12Days

-- --
4900
Total: $
BZT52C4V3S
Yangjie
4.3V 200mW 3uA@1V 90Ω

Lead Time: 9-12Days

-- --
6100
Total: $
CS1J101M-CRG10
Swst
63V ±20% 100uF 10mm

Lead Time: 9-12Days

-- --
7100
Total: $
S120Q
Yangjie

Lead Time: 9-12Days

-- --
7300
Total: $
CS1E471M-CRG10
Swst
25V ±20% 470uF 10mm

Lead Time: 9-12Days

-- --
8900
Total: $
CK1E331M-CRF10
Swst
25V ±20% 330uF 8mm

Lead Time: 9-12Days

-- --
9100
Total: $
S8050M-D HY3D
Blue Rocket
NPN :25V :800mA

Lead Time: 9-12Days

-- --
6900
Total: $
IP101GRI
Ic Plus Corp.

Lead Time: 9-12Days

-- --
3100
Total: $
2R470TD-8
Ruilon
2R470TD-8

Lead Time: 9-12Days

-- --
6900
Total: $
2N5401YBU
Onsemi
BJT 625mW 150V 600mA PNP

Lead Time: 9-12Days

-- --
5900
Total: $
2N5551TA
Onsemi
BJT 625mW 160V 600mA NPN

Lead Time: 9-12Days

-- --
9900
Total: $
2SCR586JFRGTLL
Rohm Semiconductor
BJT 40W 80V 5A NPN

Lead Time: 9-12Days

-- --
8500
Total: $
BD42754FP2-CE2
Rohm Semiconductor
LDO BD42754FP2-CE2

Lead Time: 9-12Days

-- --
9500
Total: $
  • 1
  • 720
  • 721
  • 722
  • 723
  • 724
  • 6854
Go to