Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
R5460N213AD-TR-FE
Nisshinbo Micro Device Inc.
2-Cell Li-ion Battery Protection

Lead Time: 9-12Days

-- --
1500
Total: $
MMSZ22T1G
Onsemi
Diode Zener Single 22V 5% 500mW 2-Pin SOD-123

Lead Time: 9-12Days

-- --
7300
Total: $
SMUN5115T1G
Onsemi
Transistor: PNP; bipolar; BRT; 50V; 0.1A; 0.31W; SC70,SOT323;

Lead Time: 9-12Days

-- --
4100
Total: $
CL03A225MP3CRNC
Samsung
MLCC 10V ±20% 2.2uF X5R

Lead Time: 9-12Days

-- --
1300
Total: $
TPD1E04U04DPLR-TP
Tech Public

Lead Time: 9-12Days

-- --
1700
Total: $
AC1210FR-0730K1L
Yageo
500mW 30.1kΩ ±1%

Lead Time: 9-12Days

-- --
1900
Total: $
SMF24CA
Mdd
TVS SMF24CA 24V SOD-123FL

Lead Time: 9-12Days

-- --
2300
Total: $
TLP293-4(TP,E(T
Toshiba
Optocoupler DC-IN 4-CH Transistor DC-OUT 16-Pin SO

Lead Time: 9-12Days

-- --
2500
Total: $
SMBJ300CA/TR13
Yageo
TVS SMBJ300CA/TR13

Lead Time: 9-12Days

-- --
3300
Total: $
P0900SB
Yageo
P0900SB

Lead Time: 9-12Days

-- --
3500
Total: $
SMAJ60A
Yangjie

Lead Time: 9-12Days

-- --
3900
Total: $
P6SMB33A
Yangjie

Lead Time: 9-12Days

-- --
4100
Total: $
GCM32DC72A475KE02L
Murata
4.7µF-±10%-100V--X7S-12103225-

Lead Time: 9-12Days

-- --
4300
Total: $
2227302-1
Te Connectivity
CONN SFP CAGE PRESS-FIT

Lead Time: 9-12Days

-- --
4500
Total: $
RL60-500
Ruilon

Lead Time: 9-12Days

-- --
5500
Total: $
RL60-110
Ruilon

Lead Time: 9-12Days

-- --
5700
Total: $
RL60-200
Ruilon

Lead Time: 9-12Days

-- --
5900
Total: $
CK1C100M-CRC54
Swst
SMD,4x5.4mm

Lead Time: 9-12Days

-- --
6100
Total: $
SGM2572CDYG/TR
Sgmicro
SGM2572CDYG/TR

Lead Time: 9-12Days

-- --
6300
Total: $
IRFS7530TRLPBF
Infineon
MOSFET 375W 60V 195A 1N

Lead Time: 9-12Days

-- --
6500
Total: $
  • 1
  • 717
  • 718
  • 719
  • 720
  • 721
  • 6854
Go to