Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SGM2203-3.6YN3LG/TR
Sgmicro
SGM2203-3.6YN3LG/TR

Lead Time: 9-12Days

-- --
6500
Total: $
SGM4808YTQA16G/TR
Sgmicro
// SGM4808YTQA16G/TR

Lead Time: 9-12Days

-- --
7300
Total: $
SD15C
Mdd
ESD SD15C 2J SOD-323

Lead Time: 9-12Days

-- --
300
Total: $
5.0SMDJ26CA
Dowo

Lead Time: 9-12Days

-- --
2700
Total: $
LM358
Dowo

Lead Time: 9-12Days

-- --
2500
Total: $
MJD253T4G
Onsemi
BJT 1.4W 100V 4A PNP

Lead Time: 9-12Days

-- --
6700
Total: $
MK15-B-2
Standexmeder

Lead Time: 9-12Days

-- --
100
Total: $
RCLAMP0521P-N
Dowo
ESD/TVS VRWM=5V VBRmin=6V VC=16V@IPP=3.5A DFN1006-2

Lead Time: 9-12Days

-- --
1500
Total: $
SMAJ6.5CA
Dowo
ESD/TVS VRWM=6.5V VBRmin=7.22V VC=11.2V@IPP=35.71A SMA

Lead Time: 9-12Days

-- --
7100
Total: $
CS1H100M-CRD54
Swst
50V ±20% 10uF 5mm

Lead Time: 9-12Days

-- --
100
Total: $
045306.3MR
Littelfuse
Fuse: fuse; ultra rapid; 6.3A; 125VAC; 125V; 125VDC; SMD;

Lead Time: 9-12Days

-- --
7700
Total: $
0402WGJ0271TCE
Uni-Royal
62.5mW 270Ω ±5%

Lead Time: 9-12Days

-- --
500
Total: $
CK1V221M-CRF10
Swst
220uF 35V

Lead Time: 9-12Days

-- --
8300
Total: $
CS1C100M-CRC54
Swst
16V ±20% 10uF

Lead Time: 9-12Days

-- --
5100
Total: $
CS2A470M-CRG10
Swst
100V ±20% 47uF 10mm

Lead Time: 9-12Days

-- --
6500
Total: $
ESD5451N
Dowo

Lead Time: 9-12Days

-- --
1300
Total: $
LMV321
Dowo

Lead Time: 9-12Days

-- --
7700
Total: $
MBR0540
Dowo

Lead Time: 9-12Days

-- --
6700
Total: $
MVR1206-330G
Dowo

Lead Time: 9-12Days

-- --
8300
Total: $
NCE60NF031T
Ncepower

Lead Time: 9-12Days

-- --
9500
Total: $
  • 1
  • 705
  • 706
  • 707
  • 708
  • 709
  • 6854
Go to