Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SMAJ36CA
Umw

Lead Time: 9-12Days

-- --
7100
Total: $
SMAJ30CA
Umw

Lead Time: 9-12Days

-- --
6300
Total: $
SMBJ24A
Umw

Lead Time: 9-12Days

-- --
8100
Total: $
ESD5Z5.0T1G
Umw

Lead Time: 9-12Days

-- --
700
Total: $
ESDU5V0H4
Umw

Lead Time: 9-12Days

-- --
3900
Total: $
FHD4020S-4R7MT
Cjiang
4.9A 4.7uH ±20% 3.3A

Lead Time: 9-12Days

-- --
5100
Total: $
FNR4030S100MT
Cjiang
2.4A 10uH ±20% 1.6A

Lead Time: 9-12Days

-- --
2900
Total: $
FXL0630-3R3-M
Cjiang
9.5A 3.3uH ±20% 8.5A

Lead Time: 9-12Days

-- --
3700
Total: $
FXL0630-2R2-M
Cjiang
10A 2.2uH ±20% 9.5A

Lead Time: 9-12Days

-- --
3900
Total: $
FXL0420-1R0-M
Cjiang
7A 1uH ±20% 6A

Lead Time: 9-12Days

-- --
6500
Total: $
FXL0530-6R8-M
Cjiang
4A 6.8uH ±20% 3.5A

Lead Time: 9-12Days

-- --
4100
Total: $
FXL0530-2R2-M
Cjiang
7.5A 2.2uH ±20% 7A

Lead Time: 9-12Days

-- --
5300
Total: $
FXL0650-330-M
Cjiang
3A 33uH ±20% 2.3A

Lead Time: 9-12Days

-- --
6700
Total: $
FXL1040-220-M
Cjiang
5.5A 22uH ±20% 5A

Lead Time: 9-12Days

-- --
8300
Total: $
FTC252012S1R0MBCA
Cjiang
5.6A 1uH ±20% 4A

Lead Time: 9-12Days

-- --
2700
Total: $
FXL0630-4R7-M
Cjiang
9A 4.7uH ±20% 6A

Lead Time: 9-12Days

-- --
1900
Total: $
FXL0630-220-M
Cjiang
3A 22uH ±20% 2.5A

Lead Time: 9-12Days

-- --
2500
Total: $
MMBFJ176
Onsemi
JFET 225mW 1V@10nA 30V P

Lead Time: 9-12Days

-- --
3500
Total: $
MICROSMD075F-2
Littelfuse
MICROSMDF Series 1210 6 V 0.75 A Surface Mount PolySwitch Resettable

Lead Time: 9-12Days

-- --
7300
Total: $
MM3Z24
Swst
24V 22.8V~25.6V 100nA@19V

Lead Time: 9-12Days

-- --
4500
Total: $
  • 1
  • 690
  • 691
  • 692
  • 693
  • 694
  • 6854
Go to