Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
BZX384C4V7-E3-08
Vishay
4.7V 200mW 3uA@2V 80Ω

Lead Time: 9-12Days

-- --
8300
Total: $
CMB02070X1002GB200
Vishay
CMA0207 Resistor

Lead Time: 9-12Days

-- --
100
Total: $
CRCW060322R1FKEA
Vishay
CRCW Series 0603 0.1 W 22.1 Ohm ±1 % ±100 ppm/K SMT Thick Film Chip

Lead Time: 9-12Days

-- --
900
Total: $
FXLB252012-2R2-M
Cjiang
3.3A 2.2uH ±20% 3A

Lead Time: 9-12Days

-- --
5300
Total: $
FXL1040-150-M
Cjiang
7A 15uH ±20% 6.5A

Lead Time: 9-12Days

-- --
5700
Total: $
FXL1040-330-M
Cjiang
5A 33uH ±20% 4.4A

Lead Time: 9-12Days

-- --
7100
Total: $
FXL0630-1R0-M
Cjiang
15A 1uH ±20% 12A

Lead Time: 9-12Days

-- --
4100
Total: $
G6RN-1 DC24
Omron
RELAY GEN PURPOSE SPDT 8A

Lead Time: 9-12Days

-- --
6700
Total: $
LBAT54CLT1G
Dowo

Lead Time: 9-12Days

-- --
4500
Total: $
TK10A60D(STA4,X,M)
Toshiba
MOSFET TK10A60DSTA4,X,M

Lead Time: 9-12Days

-- --
7900
Total: $
TJA1027T/20/1
Nxp Semiconductors
LIN TJA1027T/SO8//20/1/REEL 13 Q1/T1 *STANDARD MARK

Lead Time: 9-12Days

-- --
1100
Total: $
ABS10
Dowo
950mV@400mA 1kV 10uA@1kV 800mA

Lead Time: 9-12Days

-- --
1900
Total: $
HN1B04FE-GR,LF(B
Toshiba
HN1B04FE-GR,LF(B

Lead Time: 9-12Days

-- --
3500
Total: $
MFR3WSFTE73-100R
Yageo
3W 100Ω ±1%

Lead Time: 9-12Days

-- --
6500
Total: $
RC0805FR-07150RL
Yageo
RES SMD 150 OHM 1% 1/8W

Lead Time: 9-12Days

-- --
9500
Total: $
SMBJ400A
Dowo

Lead Time: 9-12Days

-- --
4100
Total: $
ZIRM-5042B-42-Z2
Chau Light

Lead Time: 9-12Days

-- --
8500
Total: $
ESD9B5.0ST5G
Dowo

Lead Time: 9-12Days

-- --
1100
Total: $
ESD5471X
Dowo

Lead Time: 9-12Days

-- --
700
Total: $
FNR3015S4R7MT
Cjiang
1.4A 4.7uH ±20% 1.3A

Lead Time: 9-12Days

-- --
2500
Total: $
  • 1
  • 669
  • 670
  • 671
  • 672
  • 673
  • 6854
Go to