Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
---|---|---|---|---|---|---|---|
FTR-104-01-L-S-TR
| Samtec |
CONN HEADER SMD 4POS 1.27MM
| MPQ: 350 Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| |
1721730007
| Molex |
CONN HEADER R/A 7POS 3.96MM
| MPQ: 2400 Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
4-1734598-4
| Te Connectivity |
CONN HEADER VERT 4POS 1.25MM
| MPQ: 90 Lead Time: 9-12Days | -- -- | 9000 | Total:
$
| |
0878980425
| Molex |
CONN HEADER SMD 4POS 2.54MM
| MPQ: 1650 Lead Time: 9-12Days | -- -- | 9200 | Total:
$
| |
77311-401-19LF
| Amphenol |
CONN HEADER VERT 19POS 2.54MM
| MPQ: 200 Lead Time: 9-12Days | -- -- | 2000 | Total:
$
| |
0026486122
| Molex |
CONN HEADER R/A 10POS 3.96MM
| MPQ: 250 Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
95278-801A14LF
| Amphenol |
CONN HEADER SMD 14POS 2.54MM
| MPQ: 300 Lead Time: 9-12Days | -- -- | 1400 | Total:
$
| |
77311-101-15LF
| Amphenol |
CONN HEADER VERT 15POS 2.54MM
| MPQ: 200 Lead Time: 9-12Days | -- -- | 600 | Total:
$
| |
DF10M
| Onsemi |
BRIDGE RECT 1P 1KV 1.5A 4-DIP
| MPQ: 50 Lead Time: 9-12Days | -- -- | 1000 | Total:
$
| |
1-1586585-8
| Te Connectivity |
CONN HEADER VERT 18POS 4.2MM
| MPQ: 560 Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
10075025-F01-10ALF
| Amphenol |
CONN HEADER VERT 10POS 2MM
| MPQ: 650 Lead Time: 9-12Days | -- -- | 2200 | Total:
$
| |
800-10-007-30-001101
| Preci-Dip |
CONN HEADER SMD 7POS 2.54MM
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 8200 | Total:
$
| |
5-87348-5
| Te Connectivity |
CONN HEADER VERT 5POS 2.54MM
| MPQ: 10400 Lead Time: 9-12Days | -- -- | 1600 | Total:
$
| |
5055671181
| Molex |
CONN HEADER SMD R/A 11POS 1.25MM
| MPQ: 1200 Lead Time: 9-12Days | -- -- | 5200 | Total:
$
| |
0022285223
| Molex |
CONN HEADER VERT 22POS 2.54MM
| MPQ: 375 Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| |
0026607031
| Molex |
CONN HEADER R/A 3POS 3.96MM
| MPQ: 600 Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
892-70-026-10-002101
| Preci-Dip |
CONN HEADER VERT 26POS 2.54MM
| MPQ: 690 Lead Time: 9-12Days | -- -- | 300 | Total:
$
| |
GBU402
| Diodes Incorporated |
BRIDGE RECT 1PHASE 200V 4A GBU
| MPQ: 20 Lead Time: 9-12Days | -- -- | 5000 | Total:
$
| |
GBJ6005-F
| Diodes Incorporated |
BRIDGE RECT 1PHASE 50V 6A GBJ
| MPQ: 15 Lead Time: 9-12Days | -- -- | 7800 | Total:
$
| |
1726470105
| Molex |
CONN HEADER VERT 5POS 4.2MM
| MPQ: 84 Lead Time: 9-12Days | -- -- | 300 | Total:
$
|