Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
GBU606
Diodes Incorporated
BRIDGE RECT 1PHASE 600V 6A GBU

Lead Time: 9-12Days

-- --
8800
Total: $
FWS-02-02-T-S-RA
Samtec
CONN HEADER R/A 2POS 5.08MM

Lead Time: 9-12Days

-- --
8900
Total: $
MAX4906FELB+G069
Analog Devices
IC POWER MANAGEMENT

Lead Time: 9-12Days

-- --
5000
Total: $
SI5345A-B04211-GM
Skyworks
IC CLK MULTIPLIER ATTENUATOR

Lead Time: 9-12Days

-- --
8700
Total: $
SI5345A-B04209-GM
Skyworks
IC CLK MULTIPLIER ATTENUATOR

MPQ: 260

Lead Time: 9-12Days

-- --
4300
Total: $
SI5345A-B04208-GM
Skyworks
IC CLK MULTIPLIER ATTENUATOR

MPQ: 260

Lead Time: 9-12Days

-- --
5000
Total: $
FJV3105RMTF
Onsemi
TRANS PREBIAS NPN 50V SOT23-3

Lead Time: 9-12Days

-- --
6700
Total: $
BA7603F-BZE2
Rohm Semiconductor
IC VIDEO SIGNAL SWITCHERS 16SOP

Lead Time: 9-12Days

-- --
7200
Total: $
MOC3012M
Onsemi
OPTOISOLATOR 4.17KV TRIAC 6DIP

Lead Time: 9-12Days

-- --
3400
Total: $
SI5345A-B04046-GM
Skyworks
IC CLK MULTIPLIER ATTENUATOR

MPQ: 260

Lead Time: 9-12Days

-- --
4700
Total: $
SI5345A-B04044-GM
Skyworks
IC CLK MULTIPLIER ATTENUATOR

MPQ: 260

Lead Time: 9-12Days

-- --
3700
Total: $
SI5345A-B04017-GM
Skyworks
IC CLK MULTIPLIER ATTENUATOR

MPQ: 260

Lead Time: 9-12Days

-- --
6600
Total: $
RV1S9160ACCSP-100C#SC0
Renesas
HI-SPEED OPTOCPLR SO-5

Lead Time: 9-12Days

-- --
3700
Total: $
SI5345A-B03949-GM
Skyworks
IC CLK MULTIPLIER ATTENUATOR

MPQ: 260

Lead Time: 9-12Days

-- --
5200
Total: $
77311-801-02LF
Amphenol
CONN HEADER VERT 2POS 2.54MM

Lead Time: 9-12Days

-- --
9400
Total: $
SI53352A-D01AM
Skyworks
IC CLK BUFFER 1:2 170MHZ 32QFN

Lead Time: 9-12Days

-- --
6000
Total: $
SI5345A-B03926-GM
Skyworks
IC CLK MULTIPLIER ATTENUATOR

MPQ: 260

Lead Time: 9-12Days

-- --
6100
Total: $
T2535-600G
Stmicroelectronics
TRIAC ALTERNISTOR 600V 25A D2PAK

Lead Time: 9-12Days

-- --
1000
Total: $
SI5345A-B03889-GM
Skyworks
IC CLK MULTIPLIER ATTENUATOR

MPQ: 260

Lead Time: 9-12Days

-- --
300
Total: $
SI5345A-B03887-GM
Skyworks
IC CLK MULTIPLIER ATTENUATOR

MPQ: 260

Lead Time: 9-12Days

-- --
5300
Total: $
  • 1
  • 6575
  • 6576
  • 6577
  • 6578
  • 6579
  • 6670
Go to