Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SI5346A-B05433-GM
Skyworks
IC JITTER ATTENUATOR

MPQ: 260

Lead Time: 9-12Days

-- --
8400
Total: $
SI5346A-B04885-GM
Skyworks
IC JITTER ATTENUATOR

Lead Time: 9-12Days

-- --
6000
Total: $
DTA123YMT2L
Rohm Semiconductor
TRANS PREBIAS PNP 50V 0.1A VMT3

Lead Time: 9-12Days

-- --
6500
Total: $
SI5346A-B03548-GM
Skyworks
IC JITTER ATTENUATOR

MPQ: 260

Lead Time: 9-12Days

-- --
6400
Total: $
MUN5312DW1T2G
Onsemi
TRANS NPN/PNP PREBIAS SOT363

Lead Time: 9-12Days

-- --
7200
Total: $
SI5346A-B03246-GM
Skyworks
IC JITTER ATTENUATOR

MPQ: 260

Lead Time: 9-12Days

-- --
500
Total: $
MC1455DR2G
Onsemi
IC OSC SINGLE TIMER 8-SOIC

Lead Time: 9-12Days

-- --
5800
Total: $
SI5346A-B03115-GM
Skyworks
IC JITTER ATTENUATOR

MPQ: 260

Lead Time: 9-12Days

-- --
9200
Total: $
GBU6K
Onsemi
BRIDGE RECT 1PHASE 800V 6A GBU

Lead Time: 9-12Days

-- --
4800
Total: $
SI5346A-B03107-GM
Skyworks
IC JITTER ATTENUATOR

Lead Time: 9-12Days

-- --
8900
Total: $
NTLJD4116NT1G
Onsemi
MOSFET 2N-CH 30V 2.5A 6WDFN

Lead Time: 9-12Days

-- --
6400
Total: $
SI5346A-B03082-GM
Skyworks
IC JITTER ATTENUATOR

MPQ: 260

Lead Time: 9-12Days

-- --
4000
Total: $
SI5346A-B03043-GM
Skyworks
IC JITTER ATTENUATOR

MPQ: 260

Lead Time: 9-12Days

-- --
5400
Total: $
SI5346A-B02933-GM
Skyworks
IC JITTER ATTENUATOR

MPQ: 260

Lead Time: 9-12Days

-- --
5800
Total: $
SI5346A-D06344-GM
Skyworks
LOW-JITTER, DUAL DSPLL, 4-OUTPUT

MPQ: 260

Lead Time: 9-12Days

-- --
1300
Total: $
SI5346A-C-GM
Skyworks
LOW-JITTER, DUAL DSPLL, 4-OUTPUT

Lead Time: 9-12Days

-- --
8100
Total: $
BTA20-600CWRG
Stmicroelectronics
TRIAC ALTERNISTOR 600V 20A TO220

Lead Time: 9-12Days

-- --
1100
Total: $
SI5396K-A-GM
Skyworks
DUAL PLL JITTER ATTENUATOR WITH

MPQ: 260

Lead Time: 9-12Days

-- --
3500
Total: $
PS9851-1-F3-AX
Renesas
OPTOISO 2.5KV PUSH PULL 8SSOP

Lead Time: 9-12Days

-- --
5100
Total: $
PMDXB950UPELZ
Nexperia
MOSFET 2P-CH 20V 0.5A 6DFN

Lead Time: 9-12Days

-- --
5900
Total: $
  • 1
  • 6555
  • 6556
  • 6557
  • 6558
  • 6559
  • 6670
Go to