Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
2SC2713-BL,LF(B
Toshiba
2SC2713-BL,LF(B

Lead Time: 9-12Days

-- --
9900
Total: $
400PX4R7MEFC8X11.5
Rubycon Corporation
3.5mm 400V ±20% 4.7uF

Lead Time: 9-12Days

-- --
3900
Total: $
CGA3E2NP01H102JT0Y0N
Tdk
MLCC 50V ±5% 1nF NP0

Lead Time: 9-12Days

-- --
9100
Total: $
HFD4/3
Hongfa
HFD4/3

Lead Time: 9-12Days

-- --
4300
Total: $
HFD23-024-1ZS
Hongfa
HFD23-024-1ZS DIP

Lead Time: 9-12Days

-- --
6100
Total: $
HF33F/024-ZS3
Hongfa
HF33F/024-ZS3 DIP

Lead Time: 9-12Days

-- --
6300
Total: $
SVF3878PN
Silan
MOSFET 150W 900V 9A 1N

Lead Time: 9-12Days

-- --
5100
Total: $
DTC143EKA
Blue Rocket
DTC143EKA

Lead Time: 9-12Days

-- --
900
Total: $
FACT4532-510-2P-T
Cjiang
51uH@100kHz 50V 200mA

Lead Time: 9-12Days

-- --
1100
Total: $
FNR5040S680MT
Cjiang
1A 68uH ±20% 900mA

Lead Time: 9-12Days

-- --
4500
Total: $
FNR5040S100MT
Cjiang
2.7A 10uH ±20% 2.35A

Lead Time: 9-12Days

-- --
1300
Total: $
FNR5040S102MT
Cjiang
250mA 1mH ±20% 230mA

Lead Time: 9-12Days

-- --
3300
Total: $
FNR4030S120MT
Cjiang
1.8A 12uH ±20% 1.4A

Lead Time: 9-12Days

-- --
3300
Total: $
FNR3015S100MT
Cjiang
920mA 10uH ±20% 900mA

Lead Time: 9-12Days

-- --
1700
Total: $
FTC303020D100MBCA
Cjiang
3.8A 10uH ±20% 2.5A

Lead Time: 9-12Days

-- --
7900
Total: $
FTC201610S4R7MBCA
Cjiang
2A 4.7uH ±20% 1.6A

Lead Time: 9-12Days

-- --
9500
Total: $
FXL0530-3R3-M
Cjiang
6A 3.3uH ±20% 5.5A

Lead Time: 9-12Days

-- --
2500
Total: $
FXL0630-5R6-M
Cjiang
6.5A 5.6uH ±20% 5.5A

Lead Time: 9-12Days

-- --
3500
Total: $
FWP252012P-2R2ML
Cjiang
3A 2.2uH ±20% 2.27A

Lead Time: 9-12Days

-- --
7500
Total: $
HF41F/5-ZS
Hongfa
5V 5mm 6A

Lead Time: 9-12Days

-- --
9700
Total: $
  • 1
  • 653
  • 654
  • 655
  • 656
  • 657
  • 6854
Go to