
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
CGA6L2X7R1H105M160AD
| Tdk |
CAP CER 1UF 50V X7R 1210 EPOXY
| Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
FDMD86100
| Onsemi |
MOSFET 2N-CH 100V 10A 8PWR 5X6
| Lead Time: 9-12Days | -- -- | 3100 | Total:
$
| |
BCV65,215
| Nexperia |
TRANS NPN/PNP 30V 0.1A SOT143B
| Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| |
BB172X
| Nxp Semiconductors |
DIODE VHF VAR CAP 32V SOD323
| Lead Time: 9-12Days | -- -- | 3100 | Total:
$
| |
KTY81/120,112
| Nxp Semiconductors |
SENSOR PTC 1KOHM PBCYT2
| Lead Time: 9-12Days | -- -- | 7800 | Total:
$
| |
EMG5T2R
| Rohm Semiconductor |
TRANS 2NPN PREBIAS 0.15W EMT5
| Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
DTC124TCAT116
| Rohm Semiconductor |
TRANS PREBIAS NPN 50V 0.1A SST3
| Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
DTC144WCAT116
| Rohm Semiconductor |
TRANS PREBIAS NPN 50V 0.1A SST3
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
DTC144TCAT116
| Rohm Semiconductor |
TRANS PREBIAS NPN 50V 0.1A SST3
| Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| |
SI5347B-B06306-GM
| Skyworks |
IC CLOCK MULTIPLIER ATTENUATING
| MPQ: 260 Lead Time: 9-12Days | -- -- | 2800 | Total:
$
| |
DTC115ECAT116
| Rohm Semiconductor |
TRANS PREBIAS NPN 50V 0.1A SST3
| Lead Time: 9-12Days | -- -- | 8300 | Total:
$
| |
DTA144TCAT116
| Rohm Semiconductor |
TRANS PREBIAS PNP 50V 0.1A SST3
| Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
SI5347B-B06158-GM
| Skyworks |
IC CLOCK MULTIPLIER ATTENUATING
| Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
SI5347B-B05528-GM
| Skyworks |
IC CLOCK MULTIPLIER ATTENUATING
| MPQ: 260 Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
MB2S
| Onsemi |
BRIDGE RECT 1P 200V 500MA 4-SOIC
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
SI5347B-B05262-GM
| Skyworks |
IC CLOCK MULTIPLIER ATTENUATING
| Lead Time: 9-12Days | -- -- | 2000 | Total:
$
| |
STGP30H60DFB
| Stmicroelectronics |
IGBT TRENCH FS 600V 60A TO-220
| Lead Time: 9-12Days | -- -- | 3200 | Total:
$
| |
SI5347B-B05061-GM
| Skyworks |
IC CLOCK MULTIPLIER ATTENUATING
| MPQ: 260 Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
SI5347B-B05059-GM
| Skyworks |
IC CLOCK MULTIPLIER ATTENUATING
| MPQ: 260 Lead Time: 9-12Days | -- -- | 600 | Total:
$
| |
DTA144VCAT116
| Rohm Semiconductor |
TRANS PREBIAS PNP 50V 0.1A SST3
| Lead Time: 9-12Days | -- -- | 4400 | Total:
$
|