Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
PCA9511ADP,118
Nxp Semiconductors
--1--400kHz-8-TSSOP

Lead Time: 9-12Days

-- --
9300
Total: $
2N3906
Swst
BJT 625mW 40V 200mA PNP

Lead Time: 9-12Days

-- --
4700
Total: $
1N4448W
Swst
720mV@5mA 80V 150mA

Lead Time: 9-12Days

-- --
700
Total: $
AO3402
Bourns Inc.

Lead Time: 9-12Days

-- --
1900
Total: $
FXL0630-1R5-M
Cjiang
14A 1.5uH ±20% 12A

Lead Time: 9-12Days

-- --
3900
Total: $
MPXHZ6400AC6T1
Nxp Semiconductors
SENSOR PRESSURE ABS AXIAL

Lead Time: 9-12Days

-- --
5900
Total: $
MT8102NSBR
M3Tek

Lead Time: 9-12Days

-- --
9100
Total: $
MPSA92
Swst
BJT 625mW 300V 500mA PNP

Lead Time: 9-12Days

-- --
5100
Total: $
SGT60U65FD1PN
Silan

Lead Time: 9-12Days

-- --
5300
Total: $
SFR25U20PN
Silan
/ 1 980mV@12A 200V 12.5A

Lead Time: 9-12Days

-- --
3100
Total: $
SFR60F30AEPN
Silan

Lead Time: 9-12Days

-- --
5900
Total: $
SGM100HF12A1TFD
Silan
IGBT/ SGM100HF12A1TFD

Lead Time: 9-12Days

-- --
7500
Total: $
TK7A90E,S4X(S
Toshiba
MOSFET TK7A90E,S4XS

Lead Time: 9-12Days

-- --
6100
Total: $
2SC2713-BL,LF(B
Toshiba
2SC2713-BL,LF(B

Lead Time: 9-12Days

-- --
9900
Total: $
400PX4R7MEFC8X11.5
Rubycon Corporation
3.5mm 400V ±20% 4.7uF

Lead Time: 9-12Days

-- --
3900
Total: $
CGA3E2NP01H102JT0Y0N
Tdk
MLCC 50V ±5% 1nF NP0

Lead Time: 9-12Days

-- --
9100
Total: $
HFD4/3
Hongfa
HFD4/3

Lead Time: 9-12Days

-- --
4300
Total: $
HFD23-024-1ZS
Hongfa
HFD23-024-1ZS DIP

Lead Time: 9-12Days

-- --
6100
Total: $
HF33F/024-ZS3
Hongfa
HF33F/024-ZS3 DIP

Lead Time: 9-12Days

-- --
6300
Total: $
SVF3878PN
Silan
MOSFET 150W 900V 9A 1N

Lead Time: 9-12Days

-- --
5100
Total: $
  • 1
  • 652
  • 653
  • 654
  • 655
  • 656
  • 6854
Go to