Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
F17735222000
Vishay
CAP FILM 2.2UF 10% 630VDC AXIAL

Lead Time: 9-12Days

-- --
1400
Total: $
NB2308AI4DTG
Onsemi
IC ZD BUFFER 16TSSOP

Lead Time: 9-12Days

-- --
1300
Total: $
SI8283BC-IS
Skyworks
DGTL ISO 5KV 1CH GATE DVR 24SOIC

Lead Time: 9-12Days

-- --
3100
Total: $
NB2308AI4DG
Onsemi
IC ZD BUFFER 16SOIC

Lead Time: 9-12Days

-- --
4300
Total: $
NB2308AI4D
Onsemi
IC ZD BUFFER 16SOIC

Lead Time: 9-12Days

-- --
8500
Total: $
NB2308AI3DTG
Onsemi
IC ZD BUFFER 16TSSOP

Lead Time: 9-12Days

-- --
1900
Total: $
NB2308AI3D
Onsemi
IC ZD BUFFER 16SOIC

Lead Time: 9-12Days

-- --
4100
Total: $
NB2308AI2DT
Onsemi
IC ZD BUFFER 16TSSOP

Lead Time: 9-12Days

-- --
7600
Total: $
NB2308AI2D
Onsemi
IC ZD BUFFER 16SOIC

Lead Time: 9-12Days

-- --
9600
Total: $
NB2308AI1HDT
Onsemi
IC ZD BUFFER 16TSSOP

Lead Time: 9-12Days

-- --
900
Total: $
NB2308AI1HD
Onsemi
IC ZD BUFFER 16SOIC

Lead Time: 9-12Days

-- --
8100
Total: $
NB2308AI1D
Onsemi
IC ZD BUFFER 16SOIC

Lead Time: 9-12Days

-- --
9400
Total: $
NB2308AC5HDTG
Onsemi
IC ZD BUFFER 16TSSOP

Lead Time: 9-12Days

-- --
5800
Total: $
NB2308AC5HDG
Onsemi
IC ZD BUFFER 16SOIC

Lead Time: 9-12Days

-- --
6200
Total: $
NB2308AC5HD
Onsemi
IC ZD BUFFER 16SOIC

Lead Time: 9-12Days

-- --
7900
Total: $
DTC143EUBTL
Rohm Semiconductor
TRANS PREBIAS NPN 50V UMT3F

Lead Time: 9-12Days

-- --
3000
Total: $
NB2308AC4DTG
Onsemi
IC BUFFER CLK 8OUT 3.3V 16-TSSOP

Lead Time: 9-12Days

-- --
1600
Total: $
NB2308AC4DR2G
Onsemi
IC ZD BUFFER 16SOIC

Lead Time: 9-12Days

-- --
8900
Total: $
77313-102-12LF
Amphenol
CONN HEADER VERT 12POS 2.54MM

Lead Time: 9-12Days

-- --
2000
Total: $
NB2308AC4DG
Onsemi
IC ZD BUFFER 16SOIC

Lead Time: 9-12Days

-- --
7800
Total: $
  • 1
  • 6514
  • 6515
  • 6516
  • 6517
  • 6518
  • 6670
Go to