Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
2SC4213-B(TE85L,F)
Toshiba
BJT 100mW 20V 300mA NPN

Lead Time: 9-12Days

-- --
1500
Total: $
CJ6206A38M
Jscj

Lead Time: 9-12Days

-- --
7500
Total: $
HT7533

Lead Time: 9-12Days

-- --
1300
Total: $
BAT54C
Blue Rocket
SOT23 Vrrm=30V If=200mA Ifsm=600mA Pd=290mW Ct=10pF Trr=5ns

Lead Time: 9-12Days

-- --
500
Total: $
BC817
Blue Rocket
40 NPN 45V 500mA

Lead Time: 9-12Days

-- --
2700
Total: $
MMBT2907A
Blue Rocket

Lead Time: 9-12Days

-- --
3100
Total: $
DTA114EKA
Blue Rocket
DTA114EKA

Lead Time: 9-12Days

-- --
3700
Total: $
2SA1020-Y
Blue Rocket
PNP :50V :2A Y120-240

Lead Time: 9-12Days

-- --
4900
Total: $
2SC2712-GR
Blue Rocket
NPN :50V :150mA GR200-400

Lead Time: 9-12Days

-- --
5100
Total: $
SS24
Blue Rocket

Lead Time: 9-12Days

-- --
8500
Total: $
2SB649AD-C
Blue Rocket
TO252-3 Vcbo=180V Vceo=160V Vebo=5V Ic=1.5A Pc=1W

Lead Time: 9-12Days

-- --
9500
Total: $
8550T-D
Blue Rocket
BJT 8550T-D

Lead Time: 9-12Days

-- --
6100
Total: $
9013M-H
Blue Rocket
NPN 20V 500mA H144~202 SOT-23

Lead Time: 9-12Days

-- --
7700
Total: $
BR80N08A
Blue Rocket

Lead Time: 9-12Days

-- --
7700
Total: $
FC2712
FC2712

Lead Time: 9-12Days

-- --
2100
Total: $
FNR6045S220MT
Cjiang
2.2A 22uH ±20% 2A

Lead Time: 9-12Days

-- --
3700
Total: $
FNR4030S330MT
Cjiang
1.2A 33uH ±20% 920mA

Lead Time: 9-12Days

-- --
5100
Total: $
FNR6045S102MT
Cjiang
350mA 1mH ±20% 350mA

Lead Time: 9-12Days

-- --
1900
Total: $
FNR4030S680MT
Cjiang
800mA 68uH ±20% 570mA

Lead Time: 9-12Days

-- --
2100
Total: $
FNR4030S6R8MT
Cjiang
3A 6.8uH ±20% 1.7A

Lead Time: 9-12Days

-- --
2500
Total: $
  • 1
  • 648
  • 649
  • 650
  • 651
  • 652
  • 6854
Go to