Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
AD820BRZ-REEL7
Analog Devices
J-FET--1---8-SOIC

Lead Time: 9-12Days

-- --
1900
Total: $
FRC2512F10R0TS
Fojan
1W 10Ω ±1% 2512

Lead Time: 9-12Days

-- --
700
Total: $
FRC1206F5R10TS
Fojan
250mW 5.1Ω ±1% 1206

Lead Time: 9-12Days

-- --
1700
Total: $
FRC0805J2R2 TS
Fojan
125mW 2.2Ω ±5% 0805

Lead Time: 9-12Days

-- --
3700
Total: $
FRC1210F2200TS
Fojan
1210 220Ω ±1% 1/2W

Lead Time: 9-12Days

-- --
5100
Total: $
FRC1206F2403TS
Fojan
250mW 240kΩ ±1% 1206

Lead Time: 9-12Days

-- --
6500
Total: $
FRC1206F47R0TS
Fojan
250mW 47Ω ±1% 1206

Lead Time: 9-12Days

-- --
7100
Total: $
FRC1206J473 TS
Fojan
250mW 47kΩ ±5% 1206

Lead Time: 9-12Days

-- --
8300
Total: $
FRC0805J223 TS
Fojan
0805 22KΩ ±5% 1/8W

Lead Time: 9-12Days

-- --
8900
Total: $
FRC0805F8201TS
Fojan
125mW 8.2kΩ ±1% 0805

Lead Time: 9-12Days

-- --
9100
Total: $
FRC0805F1212TS
Fojan
125mW 12.1kΩ ±1% 0805

Lead Time: 9-12Days

-- --
9300
Total: $
FRC1206F6802TS
Fojan
250mW 68kΩ ±1% 1206

Lead Time: 9-12Days

-- --
9700
Total: $
FRL1206FR120TS
Fojan
250mW 120mΩ ±1% 1206

Lead Time: 9-12Days

-- --
9300
Total: $
FRC2512F33R0TS
Fojan
1W 33Ω ±1% 2512

Lead Time: 9-12Days

-- --
900
Total: $
FRC0603F5600TS
Fojan
100mW 560Ω ±1% 0603

Lead Time: 9-12Days

-- --
5500
Total: $
FRC0603F1072TS
Fojan
100mW 10.7kΩ ±1% 0603

Lead Time: 9-12Days

-- --
5700
Total: $
FRC0603F1152TS
Fojan
100mW 11.5kΩ ±1% 0603

Lead Time: 9-12Days

-- --
7300
Total: $
FRC0603F3302TS
Fojan
100mW 33kΩ ±1% 0603

Lead Time: 9-12Days

-- --
8300
Total: $
FRC0603F2152TS
Fojan
100mW 21.5kΩ ±1% 0603

Lead Time: 9-12Days

-- --
9100
Total: $
FRC0603F1693TS
Fojan
100mW 169kΩ ±1% 0603

Lead Time: 9-12Days

-- --
9700
Total: $
  • 1
  • 63
  • 64
  • 65
  • 66
  • 67
  • 6854
Go to