Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SI823H2BB-IS1
Skyworks
DGTL ISO 2.5KV 2CH GT DVR 16SOIC

Lead Time: 9-12Days

-- --
6200
Total: $
SI823H4BB-IS1
Skyworks
DGTL ISO 2.5KV 2CH GT DVR 16SOIC

Lead Time: 9-12Days

-- --
7600
Total: $
SI823H3BB-IS1
Skyworks
DGTL ISO 2.5KV 2CH GT DVR 16SOIC

Lead Time: 9-12Days

-- --
9600
Total: $
SI88621EC-IS
Skyworks
DGTL ISOLTR 5KV 2CH GP 20-SOIC

Lead Time: 9-12Days

-- --
4400
Total: $
ICS307G-03
Renesas
IC CLOCK GENERATOR 16TSSOP

Lead Time: 9-12Days

-- --
5800
Total: $
ICS291PGT
Renesas
IC CLK/FREQ SYNTH 20TSSOP

Lead Time: 9-12Days

-- --
1200
Total: $
ICS291PGIT
Renesas
IC CLK/FREQ SYNTH 20TSSOP

Lead Time: 9-12Days

-- --
9400
Total: $
BM92A13MWV-ZE2
Rohm Semiconductor
IC PD CTLR USB TYPE-C 40UQFN

Lead Time: 9-12Days

-- --
800
Total: $
ICS291PG
Renesas
IC CLK/FREQ SYNTH 20TSSOP

Lead Time: 9-12Days

-- --
5600
Total: $
SI1146-M01-GMR
Silicon Laboratories Inc.
SENSOR OPT 850NMAMB IR UV 10 SMD

Lead Time: 9-12Days

-- --
6300
Total: $
ATS-X53310P-C1-R0
Advanced Thermal Solutions Inc
SUPERGRIP HEATSINK 31X31X17.5MM

Lead Time: 9-12Days

-- --
8500
Total: $
ATS-61350K-C1-R0
Advanced Thermal Solutions Inc
MAXIGRIP FANSINK 35X35X14.5MM

Lead Time: 9-12Days

-- --
1500
Total: $
290PGLF
Renesas
IC CLK/FREQ SYNTH 20TSSOP

Lead Time: 9-12Days

-- --
1700
Total: $
STGP30NC60S
Stmicroelectronics
IGBT 600V 55A TO-220

Lead Time: 9-12Days

-- --
7300
Total: $
ICS281PGT
Renesas
IC CLK/FREQ SYNTH 16TSSOP

Lead Time: 9-12Days

-- --
6400
Total: $
281PGLF
Renesas
IC CLK/FREQ SYNTH 16TSSOP

Lead Time: 9-12Days

-- --
9200
Total: $
ATS-61310K-C1-R0
Advanced Thermal Solutions Inc
MAXIGRIP FANSINK 31X31X14.5MM

Lead Time: 9-12Days

-- --
9000
Total: $
281PGILFT
Renesas
IC CLK/FREQ SYNTH 16TSSOP

Lead Time: 9-12Days

-- --
7800
Total: $
281PGILF
Renesas
IC CLK/FREQ SYNTH 16TSSOP

Lead Time: 9-12Days

-- --
4700
Total: $
ATS-X50270P-C1-R0
Advanced Thermal Solutions Inc
SUPERGRIP HEATSINK 27X27X17.5MM

Lead Time: 9-12Days

-- --
5300
Total: $
  • 1
  • 6496
  • 6497
  • 6498
  • 6499
  • 6500
  • 6670
Go to