
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
HTSW-103-23-T-S
| Samtec |
CONN HEADER VERT 3POS 2.54MM
| Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| |
ICS501GI
| Renesas |
IC CLOCK GENERATOR 8TSSOP
| Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
ICS501G
| Renesas |
IC CLOCK GENERATOR 8TSSOP
| Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
F17725222030
| Vishay |
CAP FILM 2.2UF 10% 630VDC RADIAL
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
ICS501AMT
| Renesas |
IC CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
FGA60N65SMD
| Onsemi |
IGBT FIELD STOP 650V 120A TO-3P
| Lead Time: 9-12Days | -- -- | 9800 | Total:
$
| |
501AMLFT
| Renesas |
IC CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| |
ICS501AMIT
| Renesas |
IC CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 7400 | Total:
$
| |
A7004CIHN1/T1AGBAJ
| Nxp Semiconductors |
AU10TICS
| Lead Time: 9-12Days | -- -- | 8000 | Total:
$
| |
501AMILFT
| Renesas |
IC CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 9600 | Total:
$
| |
IL-4P-S3FP2
| Jae |
CONN HEADER R/A 4POS 2.5MM
| Lead Time: 9-12Days | -- -- | 3400 | Total:
$
| |
501AMILF
| Renesas |
IC CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 2800 | Total:
$
| |
ICS501AMI
| Renesas |
IC CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
ICS501AM
| Renesas |
IC CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
IL-3P-S3FP2-1
| Jae |
CONN HEADER R/A 3POS 2.5MM
| Lead Time: 9-12Days | -- -- | 4000 | Total:
$
| |
SI1143-A11-GMR
| Silicon Laboratories Inc. |
SENSOR OPT AMBIENT 10 WFQFN
| Lead Time: 9-12Days | -- -- | 9800 | Total:
$
| |
DF51A-4P-2DS(50)
| Hirose Electric Co.,Ltd. |
CONN HEADER VERT
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
STGW30NC60KD
| Stmicroelectronics |
IGBT 600V 60A TO-247-3
| Lead Time: 9-12Days | -- -- | 2200 | Total:
$
| |
RGTH60TK65GC11
| Rohm Semiconductor |
IGBT TRENCH FS 650V 28A TO-3PFM
| Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
IL-7P-S3FP2
| Jae |
CONN HEADER R/A 7POS 2.5MM
| Lead Time: 9-12Days | -- -- | 2700 | Total:
$
|