
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
ICS601G-01
| Renesas |
IC CLK/FREQ SYNTH 16TSSOP
| Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| |
95293-101A03LF
| Amphenol |
CONN HEADER SMD 3POS 2.54MM
| Lead Time: 9-12Days | -- -- | 7200 | Total:
$
| |
ULQ2004A
| Stmicroelectronics |
TRANS 7NPN DARL 50V 500MA 16DIP
| Lead Time: 9-12Days | -- -- | 3000 | Total:
$
| |
TSW-108-23-F-S
| Samtec |
CONN HEADER VERT 8POS 2.54MM
| Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
ICS581G-02IT
| Renesas |
IC FANOUT BUFFER 16TSSOP
| Lead Time: 9-12Days | -- -- | 4400 | Total:
$
| |
NB3L204KMNG
| Onsemi |
IC CLK BUFFER 1:4 350MHZ 24QFN
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
ICS581G-02ILFT
| Renesas |
IC FANOUT BUFFER 16TSSOP
| Lead Time: 9-12Days | -- -- | 4400 | Total:
$
| |
ICS581G-02ILF
| Renesas |
IC FANOUT BUFFER 16TSSOP
| Lead Time: 9-12Days | -- -- | 6000 | Total:
$
| |
DTC113ZCAHZGT116
| Rohm Semiconductor |
TRANS PREBIAS NPN 0.1A SST3
| Lead Time: 9-12Days | -- -- | 9000 | Total:
$
| |
ICS581G-02
| Renesas |
IC FANOUT BUFFER 16TSSOP
| Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
IL-G-9P-S3L2-SA
| Jae |
CONN HEADER R/A 9POS 2.5MM
| Lead Time: 9-12Days | -- -- | 8600 | Total:
$
| |
ICS581G-01IT
| Renesas |
IC FANOUT DIST 16TSSOP
| Lead Time: 9-12Days | -- -- | 800 | Total:
$
| |
ICS581G-01I
| Renesas |
IC FANOUT DIST 16TSSOP
| Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
SI8231BB-D-IS1
| Skyworks |
DGTL ISO 2.5KV 2CH GT DVR 16SOIC
| Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
SI8640AB-B-IS1
| Skyworks |
DGTL ISOLTR 2.5KV 4CH GP 16-SOIC
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
ICS581G-01
| Renesas |
IC FANOUT DIST 16TSSOP
| Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| |
ICS574MT
| Renesas |
IC FANOUT BUFFER 8SOIC
| Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
HMTSW-104-08-G-S-100
| Samtec |
CONN HDR .100" 4POS
| Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| |
ICS574MIT
| Renesas |
IC FANOUT BUFFER 8SOIC
| Lead Time: 9-12Days | -- -- | 8600 | Total:
$
| |
MC34PF3000A0EP
| Nxp Semiconductors |
IC POWER MANAGEMENT 48QFN
| Lead Time: 9-12Days | -- -- | 7100 | Total:
$
|