
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
ICS7152MI-11T
| Renesas |
IC SS CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
PI6CV2304LE
| Diodes Incorporated |
IC CLK BUFFER 1:4 140MHZ 8TSSOP
| Lead Time: 9-12Days | -- -- | 8600 | Total:
$
| |
IKW30N65H5XKSA1
| Infineon |
IGBT Trench 650 V 55 A 188 W Through Hole PG-TO247-3
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
ICS7152MI-11
| Renesas |
IC SS CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
ICS7152MI-01
| Renesas |
IC SS CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 8600 | Total:
$
| |
DTD123TCHZGT116
| Rohm Semiconductor |
TRANS PREBIAS NPN 0.5A SST3
| Lead Time: 9-12Days | -- -- | 8600 | Total:
$
| |
ICS7152M-11T
| Renesas |
IC SS CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 800 | Total:
$
| |
ICS7152M-11
| Renesas |
IC SS CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| |
ICS7152M-02T
| Renesas |
IC SS CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
LA-501MN
| Rohm Semiconductor |
DISPLAY 7SEG 0.51" SGL GRN 10DIP
| Lead Time: 9-12Days | -- -- | 7600 | Total:
$
| |
ICS7152M-02
| Renesas |
IC SS CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 1000 | Total:
$
| |
DTA123EU3T106
| Rohm Semiconductor |
TRANS PREBIAS PNP 50V 0.1A UMT3
| Lead Time: 9-12Days | -- -- | 5200 | Total:
$
| |
ICS7152M-01
| Renesas |
IC SS CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 1800 | Total:
$
| |
ICS7152AMI-11T
| Renesas |
IC SS CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 5400 | Total:
$
| |
LA-301EL
| Rohm Semiconductor |
DISPLAY 7SEG 0.31" SGL ORG 10DIP
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
LA-301AL
| Rohm Semiconductor |
DISPLAY 7SEG 0.31" SGL RED 10DIP
| Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| |
B18B-XADSS-N-A(LF)(SN)
| J.S.T.Mfg.Co.,Ltd. |
CONN HEADER VERT 18POS 2.5MM
| Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| |
SI8431AB-D-IS1
| Skyworks |
DGTL ISOLTR 2.5KV 3CH GP 16-SOIC
| Lead Time: 9-12Days | -- -- | 1000 | Total:
$
| |
DTB113ECHZGT116
| Rohm Semiconductor |
TRANS PREBIAS PNP 50V 0.5A SST3
| Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
TSM-105-01-L-SV-TR
| Samtec |
CONN HEADER SMD 5POS 2.54MM
| Lead Time: 9-12Days | -- -- | 6700 | Total:
$
|