Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
STM32G0B1VET6TR
Stmicroelectronics
MCU/MPU/SOC 1.7V~3.6V 94 64MHz -40℃~+85℃

Lead Time: 9-12Days

-- --
7700
Total: $
AC0603FR-072KL
Yageo
RES SMD 2K OHM 1% 1/10W

Lead Time: 9-12Days

-- --
8100
Total: $
IRLR7843TR
Umw
MOSFET N-CH 30V 161A

Lead Time: 9-12Days

-- --
9300
Total: $
SJD12C10L01
Yageo
ESD SJD12C10L01

Lead Time: 9-12Days

-- --
100
Total: $
RC0402FR-0724KL
Yageo
RES SMD 24K OHM 1% 1/16W

Lead Time: 9-12Days

-- --
7900
Total: $
RC0201FR-0733RL
Yageo
RES SMD 33 OHM 1% 1/20W

Lead Time: 9-12Days

-- --
8900
Total: $
CC0603KRX7R6BB104
Yageo
MLCC 10V ±10% 100nF X7R

Lead Time: 9-12Days

-- --
3500
Total: $
FNR4020S150MT
Cjiang
1.5A 15uH ±20% 1.1A

Lead Time: 9-12Days

-- --
1900
Total: $
FNR4018S4R7MT
Cjiang
2.2A 4.7uH ±20% 1.8A

Lead Time: 9-12Days

-- --
2300
Total: $
FNR4030S221MT
Cjiang
500mA 220uH ±20% 400mA

Lead Time: 9-12Days

-- --
2500
Total: $
NTB0104BQ-Q100X
Nxp Semiconductors
---1--4--100Mbps-14-DHVQFN2.5x3

Lead Time: 9-12Days

-- --
7300
Total: $
AP3783RAK6TR-G1
Diodes Incorporated
PRIMARY SIDE REGULATED SWITCHING MODE POWER SUPPLY

Lead Time: 9-12Days

-- --
2100
Total: $
FXL1040-4R7-M
Cjiang
15A 4.7uH ±20% 9A

Lead Time: 9-12Days

-- --
4500
Total: $
FXL0624-4R7-M
Cjiang
7.5A 4.7uH ±20% 5A

Lead Time: 9-12Days

-- --
4900
Total: $
FXL1360-4R7-M
Cjiang
24A 4.7uH ±20% 20A

Lead Time: 9-12Days

-- --
5900
Total: $
FTC404020S100MGCA
Cjiang

Lead Time: 9-12Days

-- --
3700
Total: $
MOC3052M
Umw
1.18V 100mA

Lead Time: 9-12Days

-- --
1100
Total: $
MOC3053SM
Umw

Lead Time: 9-12Days

-- --
5100
Total: $
FDD4141
Umw
MOSFET P-CH 40V 10.8A/50A

Lead Time: 9-12Days

-- --
1500
Total: $
FEXL0550A-100M
Cjiang
6.5A 10uH ±20% 5A

Lead Time: 9-12Days

-- --
7500
Total: $
  • 1
  • 644
  • 645
  • 646
  • 647
  • 648
  • 6854
Go to