Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
IDT2308A-1HPGI8
Renesas
IC MULT ZDB 16TSSOP

Lead Time: 9-12Days

-- --
2500
Total: $
IDT2308A-1HPGI
Renesas
IC MULT ZDB 16TSSOP

Lead Time: 9-12Days

-- --
9600
Total: $
IDT2308A-1HPG8
Renesas
IC MULT ZDB 16TSSOP

Lead Time: 9-12Days

-- --
7300
Total: $
IDT2308A-1HPG
Renesas
IC MULT ZDB 16TSSOP

Lead Time: 9-12Days

-- --
3000
Total: $
IDT2308A-1HDCI8
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
4500
Total: $
IDT2308A-1HDCI
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
8500
Total: $
2308A-1HDCGI8
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
7600
Total: $
2308A-1HDCGI
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
7800
Total: $
2308A-1HDCG8
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
1300
Total: $
IDT2308A-1HDC8
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
3100
Total: $
IDT2308A-1HDC
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
1100
Total: $
IDT2308A-1DCI8
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
1500
Total: $
IDT2308A-1DCI
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
6800
Total: $
IDT2308A-1DC8
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
2400
Total: $
IDT2308A-1DC
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
8900
Total: $
FGB40T65SPD-F085
Onsemi
IGBT TRENCH FS 650V 80A TO-263

Lead Time: 9-12Days

-- --
5000
Total: $
IDT2308-5HPGI8
Renesas
IC MULT ZDB 16TSSOP

Lead Time: 9-12Days

-- --
3800
Total: $
IDT2308-5HPGI
Renesas
IC MULT ZDB 16TSSOP

Lead Time: 9-12Days

-- --
600
Total: $
NCL2801CFADR2G
Onsemi
IC PFC CTRLR CRM/DCM 8SOIC

Lead Time: 9-12Days

-- --
400
Total: $
2308-5HPGGI8
Renesas
IC MULT ZDB 16TSSOP

Lead Time: 9-12Days

-- --
3000
Total: $
  • 1
  • 6446
  • 6447
  • 6448
  • 6449
  • 6450
  • 6670
Go to