Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
IDT2308A-4DC8
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
2800
Total: $
IDT2308A-4DC
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
9500
Total: $
IDT2308A-3DCI8
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
9900
Total: $
IDT2308A-3DCI
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
6600
Total: $
2308A-3DCGI8
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
7100
Total: $
2308A-3DCGI
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
2400
Total: $
IDT2308A-3DCG8
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
8500
Total: $
IDT2308A-3DCG
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
5100
Total: $
IDT2308A-3DC8
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
4800
Total: $
IDT2308A-3DC
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
1900
Total: $
IDT2308A-2HDCGI8
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
7500
Total: $
IDT2308A-2HDCGI
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
300
Total: $
IDT2308A-2HDCG8
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
6400
Total: $
IDT2308A-2HDCG
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
7600
Total: $
IDT2308A-2HDC8
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
6300
Total: $
IDT2308A-2HDC
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
100
Total: $
IDT2308A-2DCI8
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
7200
Total: $
IDT2308A-2DCI
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
700
Total: $
IDT2308A-2DC8
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
200
Total: $
IDT2308A-2DC
Renesas
IC MULT ZDB 16SOIC

Lead Time: 9-12Days

-- --
900
Total: $
  • 1
  • 6445
  • 6446
  • 6447
  • 6448
  • 6449
  • 6670
Go to