Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
RS7533-1YF3
Runic
RS75xx-1

Lead Time: 9-12Days

-- --
700
Total: $
CJSMBJ36CA
Jscj
TVS CJSMBJ36CA SMBG

Lead Time: 9-12Days

-- --
500
Total: $
MM1Z15W
Jingdao
15V 13.8V~15.6V 500mW 100nA@11V

Lead Time: 9-12Days

-- --
9700
Total: $
NCX2200GMAZ
Nxp Semiconductors
----6-XSON-SOT8861.45x1

Lead Time: 9-12Days

-- --
3500
Total: $
PCF8551BTT/AY
Nxp Semiconductors
IC LCD Driver SPI 36X4

Lead Time: 9-12Days

-- --
3700
Total: $
PCAL6408AHKX
Nxp Semiconductors
I-O--8-I²C-SMBus-400kHz-16-XQFN1.8x2.6

Lead Time: 9-12Days

-- --
900
Total: $
BAP64Q,125
Nxp Semiconductors
--PIN-2--CA-+-CC-100V-100mA-125mW-5-TSOP

Lead Time: 9-12Days

-- --
6500
Total: $
CJ6109A33GW
Jscj
LDO 6V 1A 75dB 3.3V

Lead Time: 9-12Days

-- --
9300
Total: $
CJSMF16CA
Jscj

Lead Time: 9-12Days

-- --
2700
Total: $
CJSMF26CA
Jscj

Lead Time: 9-12Days

-- --
7900
Total: $
LT1962EMS8-3.3#TRPBF
Analog Devices
PMIC---1--300mA-8-MSOP

Lead Time: 9-12Days

-- --
4100
Total: $
NTS0104BQ-Q100X
Nxp Semiconductors
---1--4--50Mbps-14-DHVQFN2.5x3

Lead Time: 9-12Days

-- --
5300
Total: $
NVT2006BQ,115
Nxp Semiconductors
---1--6--16-DHVQFN2.5x3.5

Lead Time: 9-12Days

-- --
6100
Total: $
SMAJ20A
Jscj

Lead Time: 9-12Days

-- --
1700
Total: $
SMAJ40A
Jscj

Lead Time: 9-12Days

-- --
8100
Total: $
SMBJ24CA
Jscj
TVS SMBJ24CA SMBG

Lead Time: 9-12Days

-- --
2500
Total: $
TLP2270(D4-TP4,E(O
Toshiba
Optocoupler Logic-Out Logic, Buffer-IN 8-Pin SO

Lead Time: 9-12Days

-- --
4500
Total: $
VHF100505HQ1N5ST
Fh
100mΩ 1.5nH 300mA

Lead Time: 9-12Days

-- --
8300
Total: $
TJA1021AT/0Z
Nxp Semiconductors
LIN ,5.5 27 V ,10.4 Kbaud,-40 °C 150

Lead Time: 9-12Days

-- --
5700
Total: $
TJA1027T/20,118
Nxp Semiconductors
LIN TJA1027T/20,118

Lead Time: 9-12Days

-- --
7500
Total: $
  • 1
  • 638
  • 639
  • 640
  • 641
  • 642
  • 6854
Go to