Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
CC0402BRNPO9BN5R6
Yageo
MLCC 50V 5.6pF NP0

Lead Time: 9-12Days

-- --
8700
Total: $
CC0402BRNPO9BN1R2
Yageo
MLCC 50V 1.2pF NP0

Lead Time: 9-12Days

-- --
9500
Total: $
CC0402FRNPO9BN180
Yageo
18pF-±1%-50V--C0G-NP0-04021005-

Lead Time: 9-12Days

-- --
8500
Total: $
CC0805JRNPO9BN470
Yageo
MLCC 50V ±5% 47pF NP0

Lead Time: 9-12Days

-- --
700
Total: $
CC0603KRX7RYBB102
Yageo
MLCC 250V ±10% 1nF X7R

Lead Time: 9-12Days

-- --
1100
Total: $
CC0805KKX7R0BB474
Yageo
MLCC 100V ±10% 470nF X7R

Lead Time: 9-12Days

-- --
7100
Total: $
CC0603KRX5R8BB684
Yageo
MLCC 25V ±10% 680nF X5R

Lead Time: 9-12Days

-- --
2300
Total: $
CC0402KRX7R9BB822
Yageo
MLCC 50V ±10% 8.2nF X7R

Lead Time: 9-12Days

-- --
8300
Total: $
CC0402JRNPO9BN681
Yageo
MLCC 50V ±5% 680pF NP0

Lead Time: 9-12Days

-- --
8500
Total: $
CC0402KRX5R6BB225
Yageo
MLCC 10V ±10% 2.2uF X5R

Lead Time: 9-12Days

-- --
100
Total: $
CC0603KRX7R9BB563
Yageo
MLCC 50V ±10% 56nF X7R

Lead Time: 9-12Days

-- --
2100
Total: $
CC0603KRX7R6BB225
Yageo
MLCC 10V ±10% 2.2uF X7R

Lead Time: 9-12Days

-- --
2300
Total: $
CC0603JRX7R9BB333
Yageo
MLCC 50V ±5% 33nF X7R

Lead Time: 9-12Days

-- --
2900
Total: $
CC0603BRNPO9BN1R0
Yageo
MLCC 50V 1pF NP0

Lead Time: 9-12Days

-- --
5100
Total: $
CC0402JRNPO9BN391
Yageo
MLCC 50V ±5% 390pF NP0

Lead Time: 9-12Days

-- --
9100
Total: $
CC0603JRNPO9BN152
Yageo
MLCC 50V ±5% 1.5nF NP0

Lead Time: 9-12Days

-- --
9500
Total: $
CC0603JRX7R9BB473
Yageo
MLCC 50V ±5% 47nF X7R

Lead Time: 9-12Days

-- --
9700
Total: $
CC1206JKNPOCBN221
Yageo
MLCC 1kV ±5% 220pF NP0

Lead Time: 9-12Days

-- --
100
Total: $
CC0805KRX7R9BB221
Yageo
220pF-±10%-50V--X7R-08052012-

Lead Time: 9-12Days

-- --
500
Total: $
CC1206KKX7RABB104
Yageo
.1µF-±10%-200V--X7R-12063216-

Lead Time: 9-12Days

-- --
8700
Total: $
  • 1
  • 635
  • 636
  • 637
  • 638
  • 639
  • 6854
Go to