Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
HCTL-1101-PLC
Broadcom(Avago)
IC MOTOR DRIVER BIPOLAR 44PLCC

MPQ: 250

Lead Time: 9-12Days

-- --
3300
Total: $
BTN7960BAUMA1
Infineon
IC MOTOR DRIVER 8V-18V TO263-7

MPQ: 1000

Lead Time: 9-12Days

-- --
1800
Total: $
BTN7970BAUMA1
Infineon
IC MOTOR DRIVER 8V-18V TO263-7

MPQ: 1000

Lead Time: 9-12Days

-- --
7700
Total: $
170472J630BB
Cornell Dubilier
CAP FILM 4700PF 5% 630VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
2000
Total: $
BTN7971BAUMA1
Infineon
IC MOTOR DRIVER 8V-18V TO263-7

MPQ: 1000

Lead Time: 9-12Days

-- --
8300
Total: $
170394K160HC
Cornell Dubilier
CAP FILM 0.39UF 10% 160VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
4600
Total: $
BZB784-C4V3,115
Nexperia
DIODE ZENER ARRAY 4.3V SOT-323

MPQ: 3000

Lead Time: 9-12Days

-- --
5000
Total: $
170394J250JE
Cornell Dubilier
CAP FILM 0.39UF 5% 250VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
7100
Total: $
170394J160HC
Cornell Dubilier
CAP FILM 0.39UF 5% 160VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
7900
Total: $
BZB784-C7V5,115
Nexperia
DIODE ZENER ARRAY 7.5V SOT-323

MPQ: 3000

Lead Time: 9-12Days

-- --
2400
Total: $
BZB784-C10,115
Nexperia
DIODE ZENER ARRAY 10V SOT-323

MPQ: 3000

Lead Time: 9-12Days

-- --
2600
Total: $
BZB784-C12,115
Nexperia
DIODE ZENER ARRAY 12V SOT-323

MPQ: 3000

MOQ: 3000

Increment: 3000

Lead Time: 5-7 Days

3000+ $ 0.029921

12000
Total: $ 89.76
BZB784-C2V7,115
Nexperia
DIODE ZENER ARRAY 2.7V SOT-323

MPQ: 3000

Lead Time: 9-12Days

-- --
2500
Total: $
BZB784-C3V0,115
Nexperia
DIODE ZENER ARRAY 3V SOT-323

MPQ: 3000

Lead Time: 9-12Days

-- --
4800
Total: $
170335K250ZF
Cornell Dubilier
CAP FILM 3.3UF 10% 250VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
300
Total: $
170335K160TF
Cornell Dubilier
CAP FILM 3.3UF 10% 160VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
2600
Total: $
BZB784-C3V6,115
Nexperia
DIODE ZENER ARRAY 3.6V SOT-323

MPQ: 3000

Lead Time: 9-12Days

-- --
9700
Total: $
170335J250ZF
Cornell Dubilier
CAP FILM 3.3UF 5% 250VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
6300
Total: $
BZB784-C3V9,115
Nexperia
DIODE ZENER ARRAY 3.9V SOT-323

MPQ: 3000

Lead Time: 9-12Days

-- --
3000
Total: $
170335J160TF
Cornell Dubilier
CAP FILM 3.3UF 5% 160VDC AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
3100
Total: $
  • 1
  • 628
  • 629
  • 630
  • 631
  • 632
  • 6654
Go to