Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
BZB784-C3V0,115
Nexperia
DIODE ZENER ARRAY 3V SOT-323

MPQ: 3000

Lead Time: 9-12Days

-- --
4800
Total: $
170335K250ZF
Cornell Dubilier
CAP FILM 3.3UF 10% 250VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
300
Total: $
170335K160TF
Cornell Dubilier
CAP FILM 3.3UF 10% 160VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
2600
Total: $
BZB784-C3V6,115
Nexperia
DIODE ZENER ARRAY 3.6V SOT-323

MPQ: 3000

Lead Time: 9-12Days

-- --
9700
Total: $
170335J250ZF
Cornell Dubilier
CAP FILM 3.3UF 5% 250VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
6300
Total: $
BZB784-C3V9,115
Nexperia
DIODE ZENER ARRAY 3.9V SOT-323

MPQ: 3000

Lead Time: 9-12Days

-- --
3000
Total: $
170335J160TF
Cornell Dubilier
CAP FILM 3.3UF 5% 160VDC AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
3100
Total: $
170334K630TF
Cornell Dubilier
CAP FILM 0.33UF 10% 630VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
4600
Total: $
UMZ30KFHTL
Rohm Semiconductor
DIODE ZENER ARRAY 29.94V UMD4

MPQ: 3000

Lead Time: 9-12Days

-- --
5100
Total: $
BZB984-C6V8,115
Nexperia
DIODE ZENER ARRAY 6.8V SOT-663

MPQ: 4000

Lead Time: 9-12Days

-- --
600
Total: $
170334K250GE
Cornell Dubilier
CAP FILM 0.33UF 10% 250VDC AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
9600
Total: $
170334K160EC
Cornell Dubilier
CAP FILM 0.33UF 10% 160VDC AXIAL

MPQ: 200

Lead Time: 9-12Days

-- --
6300
Total: $
170334J630TF
Cornell Dubilier
CAP FILM 0.33UF 5% 630VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
7200
Total: $
BZB984-C8V2,115
Nexperia
DIODE ZENER ARRAY 8.2V SOT-663

MPQ: 4000

Lead Time: 9-12Days

-- --
8800
Total: $
BZB984-C11,115
Nexperia
DIODE ZENER ARRAY 11V SOT-663

MPQ: 4000

Lead Time: 9-12Days

-- --
5500
Total: $
BZB984-C13,115
Nexperia
DIODE ZENER ARRAY 13V SOT-663

MPQ: 4000

Lead Time: 9-12Days

-- --
5900
Total: $
170334J250GE
Cornell Dubilier
CAP FILM 0.33UF 5% 250VDC AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
5900
Total: $
170334J160EC
Cornell Dubilier
CAP FILM 0.33UF 5% 160VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
1600
Total: $
170333K630FC
Cornell Dubilier
CAP FILM 0.033UF 630VDC AXIAL

MPQ: 500

Lead Time: 9-12Days

-- --
7500
Total: $
BZB984-C7V5,115
Nexperia
DIODE ZENER ARRAY 7.5V SOT-663

MPQ: 4000

Lead Time: 9-12Days

-- --
5900
Total: $
  • 1
  • 624
  • 625
  • 626
  • 627
  • 628
  • 133044
Go to