
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
829394-3
| Te Connectivity |
CONN HEADER VERT 6POS 2.54MM
| Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
G881A04102TEU
| Amphenol |
CONN HEADER VERT 4POS 3MM
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
826631-4
| Te Connectivity |
CONN HEADER R/A 4POS 2.54MM
| Lead Time: 9-12Days | -- -- | 6000 | Total:
$
| |
641213-3
| Te Connectivity |
CONN HEADER VERT 3POS 2.54MM
| Lead Time: 9-12Days | -- -- | 1800 | Total:
$
| |
3-176976-2
| Te Connectivity |
CONN HEADER VERT 3POS 3.96MM
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
G881A10102T3EU
| Amphenol |
CONN HEADER VERT 10POS 3MM
| Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
PI6LC48H02LIE
| Diodes Incorporated |
IC CLOCK GENERATOR 16TSSOP
| Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
95157-210LF
| Amphenol |
CONN HEADER SMD 10POS 2.54MM
| Lead Time: 9-12Days | -- -- | 3600 | Total:
$
| |
G881A08001TEU
| Amphenol |
CONN HEADER R/A 8POS 3MM
| Lead Time: 9-12Days | -- -- | 7800 | Total:
$
| |
86130102323345E1LF
| Amphenol |
CONN HEADER R/A 10POS 2.54MM
| Lead Time: 9-12Days | -- -- | 6200 | Total:
$
| |
B32371A4606J080
| Tdk |
CAP FILM 60UF 5% 480VAC RADIAL
| Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| |
DZ23C15-7-F
| Diodes Incorporated |
DIODE ZENER ARRAY 15V SOT-23-3
| Lead Time: 9-12Days | -- -- | 2400 | Total:
$
| |
PUMD3,125
| Nexperia |
TRANS PREBIAS 1NPN 1PNP 6TSSOP
| Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| |
EPM7064AETC44-4N
| Intel |
IC CPLD 64MC 4.5NS 44TQFP
| Lead Time: 9-12Days | -- -- | 9400 | Total:
$
| |
PUMH19,115
| Nexperia |
TRANS PREBIAS 2NPN 50V 6TSSOP
| Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
LS1020AXE7KQB
| Nxp Semiconductors |
IC MPU QORIQ 1.0GHZ 525FCPBGA
| Lead Time: 9-12Days | -- -- | 3600 | Total:
$
| |
LA-301BB
| Rohm Semiconductor |
DISPLAY 7SEG 0.31" SGL BLU 10DIP
| Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| |
LA-601BL
| Rohm Semiconductor |
DISPLAY 7SEG 0.58" SGL BLU 10DIP
| Lead Time: 9-12Days | -- -- | 4800 | Total:
$
| |
MPC855TVR80D4
| Nxp Semiconductors |
IC MPU MPC8XX 80MHZ 357BGA
| Lead Time: 9-12Days | -- -- | 9400 | Total:
$
| |
FLC10-200B
| Stmicroelectronics |
IC FIRE LIGHTING CIRCUIT DPAK
| Lead Time: 9-12Days | -- -- | 9300 | Total:
$
|