
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
826944-5
| Te Connectivity |
CONN HEADER VERT 10POS 2.54MM
| Lead Time: 9-12Days | -- -- | 5400 | Total:
$
| |
577102B04000G
| Boyd |
HEATSINK TO-220 W/TAB .375"
| Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
20021112-00016T1LF
| Amphenol |
CONN HEADER R/A 16POS 1.27MM
| Lead Time: 9-12Days | -- -- | 5000 | Total:
$
| |
PI3TB212ZLEX
| Diodes Incorporated |
THUNDERBOLT AND DISPLAYPORT SWIT
| Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
PUMB20,115
| Nexperia |
TRANS PREBIAS 2PNP 50V 6TSSOP
| Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
MT18JSF25672AY-1G4D1
| Micron |
MODULE DDR3 SDRAM 2GB 240UDIMM
| Lead Time: 9-12Days | -- -- | 4600 | Total:
$
| |
PI3USB223ZMEX
| Diodes Incorporated |
IC USB SWITCH 10UQFN
| Lead Time: 9-12Days | -- -- | 6800 | Total:
$
| |
IP4253CZ8-4-TTL,13
| Nexperia |
FILTER RC(PI) 200 OHM/30PF SMD
| Lead Time: 9-12Days | -- -- | 1600 | Total:
$
| |
SCD475K601A3Z25-F
| Cornell Dubilier |
CAP FILM 4.7UF 10% 600VDC SCREW
| Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
PDTB123YUX
| Nexperia |
TRANS PREBIAS PNP 50V SOT323
| Lead Time: 9-12Days | -- -- | 6400 | Total:
$
| |
PI5L200WE
| Diodes Incorporated |
IC ETHERNET SWITCH QUAD 16SOIC
| Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
573902B04000G
| Boyd |
HEATSINK TO-220 CLIP-ON/TAB
| Lead Time: 9-12Days | -- -- | 7400 | Total:
$
| |
578622B03200G
| Boyd |
HEATSINK TO-220 DUAL MNT W/TABS
| Lead Time: 9-12Days | -- -- | 1600 | Total:
$
| |
BZB84-C39,215
| Nexperia |
DIODE ZENER ARRAY 39V TO-236AB
| Lead Time: 9-12Days | -- -- | 9600 | Total:
$
| |
1-1586585-6
| Te Connectivity |
CONN HEADER VERT 16POS 4.2MM
| Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| |
ZMT32TA
| Diodes Incorporated |
SENSOR ANGLE 180DEG SMD
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
2-1969584-8
| Te Connectivity |
CONN HEADER VERT 28POS 2.5MM
| Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
ISL6333CRZ
| Renesas |
IC REG CTRLR VR11 1OUT 48QFN
| Lead Time: 9-12Days | -- -- | 5200 | Total:
$
| |
EPM7128EQI100-15
| Intel |
IC CPLD 128MC 15NS 100QFP
| Lead Time: 9-12Days | -- -- | 6400 | Total:
$
| |
2134303-1
| Te Connectivity |
CONN HEADER VERT 4POS 2.5MM
| Lead Time: 9-12Days | -- -- | 1400 | Total:
$
|