
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
MRFE6VP6300HR5
| Nxp Semiconductors |
RF MOSFET LDMOS 50V NI780
| Lead Time: 9-12Days | -- -- | 3000 | Total:
$
| |
7020B-MTG
| Boyd |
HEATSINK TO-220 TAB FOLD 42.16MM
| Lead Time: 9-12Days | -- -- | 3800 | Total:
$
| |
529801B02500G
| Boyd |
HEATSINK TO-218 W/PINS 1.5"TALL
| Lead Time: 9-12Days | -- -- | 8200 | Total:
$
| |
6021BG
| Boyd |
HEATSINK TO-220 TABS BLACK
| Lead Time: 9-12Days | -- -- | 4200 | Total:
$
| |
534202B03453G
| Boyd |
BOARD LEVEL HEATSINK .5" TO-220
| Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| |
PDTC115EUF
| Nexperia |
TRANS PREBIAS NPN SOT323
| Lead Time: 9-12Days | -- -- | 9800 | Total:
$
| |
DMP3056LSDQ-13
| Diodes Incorporated |
MOSFET 2P-CH 30V 6.9A 8SO
| Lead Time: 9-12Days | -- -- | 5800 | Total:
$
| |
573100D00000G
| Boyd |
TOP MOUNT HEATSINK .4" D-PAK
| Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
7019B-MTG
| Boyd |
HEATSINK TO-220 TAB FOLD 25.4MM
| Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
7023B-MTG
| Boyd |
BOARD LEVEL HEATSINK 1.95" TO220
| Lead Time: 9-12Days | -- -- | 6000 | Total:
$
| |
MCIMX6Q6AVT10AE
| Nxp Semiconductors |
IC MPU I.MX6Q 1.0GHZ 624FCBGA
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
PMBT3906YS,115
| Nexperia |
TRANS 2PNP 40V 200MA 6-TSSOP
| Lead Time: 9-12Days | -- -- | 8200 | Total:
$
| |
PUMH9,125
| Nexperia |
TRANS PREBIAS 2NPN 50V 6TSSOP
| Lead Time: 9-12Days | -- -- | 300 | Total:
$
| |
STGW40H60DLFB
| Stmicroelectronics |
IGBT TRENCH FS 600V 80A TO-247
| Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
1-292206-1
| Te Connectivity |
CONN HEADER R/A 11POS 1.5MM
| Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| |
103635-2
| Te Connectivity |
CONN HEADER R/A 3POS 2.54MM
| Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
A2G22S190-01SR3
| Nxp Semiconductors |
RF MOSFET
| Lead Time: 9-12Days | -- -- | 4200 | Total:
$
| |
1586161-1
| Te Connectivity |
CONN HEADER VERT 2POS 6.35MM
| Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
PDTD123TT,215
| Nexperia |
TRANS PREBIAS NPN 50V TO236AB
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
G881B02102KEU
| Amphenol |
CONN HEADER VERT 2POS 3MM
| Lead Time: 9-12Days | -- -- | 1900 | Total:
$
|