
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
PI6C20400LEX
| Diodes Incorporated |
IC CLOCK BUFF DIFF 28-TSSOP
| Lead Time: 9-12Days | -- -- | 7800 | Total:
$
| |
1744486-6
| Te Connectivity |
CONN HEADER VERT 6POS 3.96MM
| Lead Time: 9-12Days | -- -- | 7000 | Total:
$
| |
A2I20H060NR1
| Nxp Semiconductors |
RF MOSFET LDMOS 28V TO270-15
| Lead Time: 9-12Days | -- -- | 9200 | Total:
$
| |
643130-1
| Te Connectivity |
CONN HEADER VERT 4POS 3.96MM
| Lead Time: 9-12Days | -- -- | 600 | Total:
$
| |
BC856S,125
| Nexperia |
TRANS 2PNP 65V 100MA 6-TSSOP
| Lead Time: 9-12Days | -- -- | 2600 | Total:
$
| |
SMUN2232T1G
| Onsemi |
TRANS PREBIAS NPN 50V 0.1A SC59
| Lead Time: 9-12Days | -- -- | 9500 | Total:
$
| |
1-1744426-1
| Te Connectivity |
CONN HEADER R/A 11POS 2.5MM
| Lead Time: 9-12Days | -- -- | 1800 | Total:
$
| |
542502B00000G
| Boyd |
HEATSINK TO-220 TAB BLACK
| Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
V2023B
| Assmann Wsw Components |
HEATSINK CPU XCUT
| Lead Time: 9-12Days | -- -- | 6600 | Total:
$
| |
MCIMX6Q7CZK08AE
| Nxp Semiconductors |
IC MPU I.MX6Q 800MHZ 569MAPBGA
| Lead Time: 9-12Days | -- -- | 1800 | Total:
$
| |
563002B00000G
| Boyd |
HEATSINK TO-220 VERT MNT 1.18"
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
573300D00000G
| Boyd |
TOP MOUNT HEATSINK .4" D2PAK
| Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
6030B-TTG
| Boyd |
THM,10594B-TT REV BB(COPPER)G
| Lead Time: 9-12Days | -- -- | 2800 | Total:
$
| |
EPM7128EQC100-10
| Intel |
IC CPLD 128MC 10NS 100QFP
| Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| |
5-146288-5
| Te Connectivity |
CONN HEADER VERT 5POS 2.54MM
| Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
440052-9
| Te Connectivity |
CONN HEADER VERT 9POS 2.5MM
| Lead Time: 9-12Days | -- -- | 7800 | Total:
$
| |
10072354-G01-06LF
| Amphenol |
CONN HEADER R/A 6POS 2MM
| Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
PUMD17,115
| Nexperia |
TRANS PREBIAS 1NPN 1PNP 6TSSOP
| Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| |
NGTB35N65FL2WG
| Onsemi |
IGBT TRENCH FS 650V 70A TO-247-3
| Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
1744110-2
| Te Connectivity |
CONN HEADER VERT 10POS 3.96MM
| Lead Time: 9-12Days | -- -- | 6400 | Total:
$
|