
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
7106DG
| Boyd |
BOARD LEVEL HEATSINK .375" D2PAK
| Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
1-1586586-2
| Te Connectivity |
CONN HEADER VERT 12POS 4.2MM
| Lead Time: 9-12Days | -- -- | 4000 | Total:
$
| |
EPM7192EQC160-12
| Intel |
IC CPLD 192MC 12NS 160QFP
| Lead Time: 9-12Days | -- -- | 8200 | Total:
$
| |
579302B00000G
| Boyd |
HEATSINK TO-220 SNAP-DOWN .75"
| Lead Time: 9-12Days | -- -- | 3500 | Total:
$
| |
SI8641AB-B-IS1
| Skyworks |
DGTL ISOLTR 2.5KV 4CH GP 16-SOIC
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
SI8261AAC-C-IS
| Skyworks |
DGTL ISO 3.75KV 1CH GT DVR 8SOIC
| Lead Time: 9-12Days | -- -- | 6500 | Total:
$
| |
F340X142248MKP2T0
| Vishay |
MKP F340X1 0,22F 20% 480VAC
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
507102B00000G
| Boyd |
HEATSINK TO-220 EXT CAP 2W
| Lead Time: 9-12Days | -- -- | 1600 | Total:
$
| |
77311-802-09LF
| Amphenol |
CONN HEADER VERT 9POS 2.54MM
| Lead Time: 9-12Days | -- -- | 2600 | Total:
$
| |
74AVC1T1004DPJ
| Nexperia |
IC CLK BUFFER 1:4 10TSSOP
| Lead Time: 9-12Days | -- -- | 7400 | Total:
$
| |
SI8610BB-B-IS
| Skyworks |
DGTL ISOLTR 2.5KV 1CH GP 8-SOIC
| Lead Time: 9-12Days | -- -- | 3000 | Total:
$
| |
MUN5133DW1T1G
| Onsemi |
TRANS PREBIAS 2PNP 50V SC88
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
J176-D74Z
| Onsemi |
JFET P-CH 30V TO92-3
| Lead Time: 9-12Days | -- -- | 7800 | Total:
$
| |
PDTC123TT,215
| Nexperia |
TRANS PREBIAS NPN 50V TO236AB
| Lead Time: 9-12Days | -- -- | 3000 | Total:
$
| |
SI8621AB-B-IS
| Skyworks |
DGTL ISOLTR 2.5KV 2CH GP 8-SOIC
| Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
68020-120HLF
| Amphenol |
CONN HEADER R/A 20POS 2.54MM
| Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
2-292132-2
| Te Connectivity |
CONN HEADER VERT 2POS 2MM
| Lead Time: 9-12Days | -- -- | 2600 | Total:
$
| |
MCIMX6Q6AVT10AC
| Nxp Semiconductors |
IC MPU I.MX6Q 1.0GHZ 624FCBGA
| Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
2SK1070PICTL-E
| Renesas |
JFET N-CH 22V 50MA 3MPAK
| Lead Time: 9-12Days | -- -- | 3100 | Total:
$
| |
2-103634-9
| Te Connectivity |
CONN HEADER R/A 2POS 2.54MM
| Lead Time: 9-12Days | -- -- | 1600 | Total:
$
|