
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
95157-110VLF
| Amphenol |
CONN HEADER SMD 10POS 2.54MM
| Lead Time: 9-12Days | -- -- | 4600 | Total:
$
| |
1-1318300-9
| Te Connectivity |
CONN HEADER VERT 9POS 3.96MM
| Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
MKP1841310204M
| Vishay |
CAP FILM 10000PF 5% 2KVDC RADIAL
| Lead Time: 9-12Days | -- -- | 6400 | Total:
$
| |
PIMH9,115
| Nexperia |
TRANS PREBIAS 2NPN 50V 6TSOP
| Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
890-80-012-10-001101
| Preci-Dip |
CONN HEADER VERT 12POS 2.54MM
| Lead Time: 9-12Days | -- -- | 9200 | Total:
$
| |
PBLS1504Y,115
| Nexperia |
TRANS PREBIAS 1NPN 1PNP 6TSSOP
| Lead Time: 9-12Days | -- -- | 2200 | Total:
$
| |
1-1971032-7
| Te Connectivity |
CONN PLUG HSG 7POS 2.00MM
| Lead Time: 9-12Days | -- -- | 6000 | Total:
$
| |
NSVBT2222ADW1T1G
| Onsemi |
TRANS 2NPN 40V 600MA SC88/SC70
| Lead Time: 9-12Days | -- -- | 7400 | Total:
$
| |
SI8441AB-C-IS
| Skyworks |
DGTL ISOLTR 2.5KV 4CH GP 16-SOIC
| Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
577002B04000G
| Boyd |
HEATSINK TO-220 W/TAB .25
| Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
54202-G0805CLF
| Amphenol |
CONN HDR BERGSTIK
| Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| |
77313-124-10LF
| Amphenol |
CONN HEADER VERT 10POS 2.54MM
| Lead Time: 9-12Days | -- -- | 6800 | Total:
$
| |
MMUN2113LT3G
| Onsemi |
TRANS PREBIAS PNP 50V SOT23-3
| Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
PBSS5260PAP,115
| Nexperia |
TRANS 2PNP 60V 2A 6HUSON
| Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| |
F340X254730MKP2T0
| Vishay |
MKP F340X2 4,7F 20% 305VAC
| Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
TSM-102-01-T-SH-TR
| Samtec |
CONN HEADER SMD R/A 2POS 2.54MM
| Lead Time: 9-12Days | -- -- | 1600 | Total:
$
| |
L6563ATR
| Stmicroelectronics |
IC PFC CTRLR TRANSITION 14SO
| Lead Time: 9-12Days | -- -- | 7800 | Total:
$
| |
77313-127-10LF
| Amphenol |
CONN HEADER VERT 10POS 2.54MM
| Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
STGB10H60DF
| Stmicroelectronics |
IGBT TRENCH FS 600V 20A TO-263
| Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
95278-102A10LF
| Amphenol |
CONN HEADER SMD 10POS 2.54MM
| Lead Time: 9-12Days | -- -- | 1600 | Total:
$
|