
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
BCM847QASZ
| Nexperia |
TRANS 2NPN 45V 100MA DFN1010B-6
| Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
1-1971817-9
| Te Connectivity |
CONN HEADER VERT 9POS 2.5MM
| Lead Time: 9-12Days | -- -- | 2200 | Total:
$
| |
1-1971954-2
| Te Connectivity |
CONN HEADER VERT 2POS 5MM
| Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
PDTC114YQAZ
| Nexperia |
TRANS PREBIAS NPN 50V 0.1A 3DFN
| Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
ECW-H6324HC
| Panasonic |
CAP FILM 0.32UF 3% 630VDC RADIAL
| Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| |
1-1586585-2
| Te Connectivity |
CONN HEADER VERT 12POS 4.2MM
| Lead Time: 9-12Days | -- -- | 2000 | Total:
$
| |
1-2132415-7
| Te Connectivity |
CONN HEADER VERT 17POS 2.5MM
| Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
SI8261ABC-C-IP
| Skyworks |
DGT ISO 3.75KV 1CH GT DVR 8DIP
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
5-146128-3
| Te Connectivity |
CONN HEADER SMD 5POS 2.54MM
| Lead Time: 9-12Days | -- -- | 2800 | Total:
$
| |
316536-1
| Te Connectivity |
CONN HEADER VERT 7POS 2.5MM
| Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
5-103330-4
| Te Connectivity |
CONN HEADER R/A 8POS 2.54MM
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
BFC233620684
| Vishay |
CAP FILM 0.68UF 20% 630VDC RAD
| Lead Time: 9-12Days | -- -- | 3100 | Total:
$
| |
NSVMUN5215DW1T1G
| Onsemi |
TRANS PREBIAS 2NPN 50V SC88
| Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
576802B03900G
| Boyd |
HEATSINK TO220 CLIPON W/TAB.75"
| Lead Time: 9-12Days | -- -- | 8800 | Total:
$
| |
DGD2103AS8-13
| Diodes Incorporated |
IC GATE DRVR HALF-BRIDGE 8SO
| Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
504102B00000G
| Boyd |
HEATSINK TO-220 PWR CLR .700"
| Lead Time: 9-12Days | -- -- | 400 | Total:
$
| |
FGHL50T65SQ
| Onsemi |
IGBT 650V 100A TO-247-3
| Lead Time: 9-12Days | -- -- | 800 | Total:
$
| |
DGD2104AS8-13
| Diodes Incorporated |
IC GATE DRVR HALF-BRIDGE 8SO
| Lead Time: 9-12Days | -- -- | 5800 | Total:
$
| |
577202B04000G
| Boyd |
HEATSINK TO-220 .500" COMPACT
| Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| |
T1235H-6I
| Stmicroelectronics |
TRIAC ALTERNISTOR 600V 12A TO220
| Lead Time: 9-12Days | -- -- | 3600 | Total:
$
|