Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
AC0603FR-0720KL
Yageo
RES SMD 20K OHM 1% 1/10W

Lead Time: 9-12Days

-- --
3300
Total: $
BSS138-G
Onsemi
Trans MOSFET N-CH 50V 0.22A 3-Pin SOT-23

Lead Time: 9-12Days

-- --
9500
Total: $
EDZVFHT2R11B
Rohm Semiconductor
Zener Diode Single 11V 2% 30Ohm 150mW Automotive 2-Pin EMD

Lead Time: 9-12Days

-- --
500
Total: $
ISO6720BDR
Texas Instruments
General purpose dual-channel, 2/0, digital

Lead Time: 9-12Days

-- --
1900
Total: $
GRT188C71C475KE13D
Murata
MLCC 16V ±10% 4.7uF X7S

Lead Time: 9-12Days

-- --
100
Total: $
GRM155R6YA105KE11D
Murata
MLCC 35V ±10% 1uF X5R

Lead Time: 9-12Days

-- --
300
Total: $
GRM188R61C226ME01D
Murata
0603

Lead Time: 9-12Days

-- --
1300
Total: $
GRM0335C1H2R0BA01D
Murata
MLCC 50V 2pF C0G

Lead Time: 9-12Days

-- --
7300
Total: $
GRM033R61C224KE14D
Murata
MLCC 16V ±10% 220nF X5R

Lead Time: 9-12Days

-- --
8500
Total: $
GRM0335C1H470JA01D
Murata
MLCC 50V ±5% 47pF C0G

Lead Time: 9-12Days

-- --
9700
Total: $
GRM0335C1H180JA01D
Murata
MLCC 50V ±5% 18pF C0G

Lead Time: 9-12Days

-- --
6300
Total: $
GRM1885C1H562JA01D
Murata
MLCC 50V ±5% 5.6nF C0G

Lead Time: 9-12Days

-- --
3500
Total: $
GCM155R71H223KA55D
Murata
MLCC 50V ±10% 22nF X7R

Lead Time: 9-12Days

-- --
8100
Total: $
GJM1555C1H1R3BB01D
Murata
MLCC 50V 1.3pF C0G

Lead Time: 9-12Days

-- --
9500
Total: $
RC0402FR-0762KL
Yageo
RES SMD 62K OHM 1% 1/16W

Lead Time: 9-12Days

-- --
8700
Total: $
RC0402FR-0740R2L
Yageo
RES SMD 40.2 OHM 1% 1/16W

Lead Time: 9-12Days

-- --
9500
Total: $
RC0402FR-074R7L
Yageo
RES SMD 4.7 OHM 1% 1/16W

Lead Time: 9-12Days

-- --
9700
Total: $
SML-P12M2TT86R
Rohm Semiconductor
/LED SML-P12M2TT86R

Lead Time: 9-12Days

-- --
2100
Total: $
TMS252012ALM-2R2MTAA
Tdk
2.8A 2.2uH ±20% 2.6A

Lead Time: 9-12Days

-- --
2500
Total: $
CC0402MRX5R7BB475
Yageo
MLCC 16V ±20% 4.7uF X5R

Lead Time: 9-12Days

-- --
7700
Total: $
  • 1
  • 603
  • 604
  • 605
  • 606
  • 607
  • 6854
Go to