Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
XC7Z020-3CLG400E
Amd
IC SOC CORTEX-A9 866MHZ 400BGA

Lead Time: 9-12Days

-- --
3200
Total: $
MKP385391100JF02W0
Vishay
CAP FILM 0.091UF 5% 1KVDC RADIAL

MPQ: 600

Lead Time: 9-12Days

-- --
2800
Total: $
XC7Z015-2CLG485I
Amd
IC SOC CORTEX-A9 766MHZ 485CSBGA

Lead Time: 9-12Days

-- --
4500
Total: $
MKP385391100JC02R0
Vishay
CAP FILM 0.091UF 5% 1KVDC RADIAL

MPQ: 500

Lead Time: 9-12Days

-- --
2200
Total: $
XC7Z020-3CLG484E
Amd
IC SOC CORTEX-A9 866MHZ 484BGA

Lead Time: 9-12Days

-- --
9400
Total: $
C0805X104J1RECAUTO
Kemet(Yageo)
CAP CER 0805 0.1UF 100V X7R 5%

MPQ: 2500

Lead Time: 9-12Days

-- --
300
Total: $
XC7Z030-1FBG484C
Amd
IC SOC CORTEX-A9 667MHZ 484FCBGA

MPQ: 1

Lead Time: 9-12Days

-- --
6400
Total: $
C0805X225J4RECAUTO
Kemet(Yageo)
CAP CER 0805 2.2UF 16V X7R 5%

MPQ: 2500

Lead Time: 9-12Days

-- --
3200
Total: $
MKP385336160JF02W0
Vishay
CAP FILM 0.036UF 5% 1.6KVDC RAD

MPQ: 600

Lead Time: 9-12Days

-- --
9900
Total: $
XC7Z030-1SBG485C
Amd
IC SOC CORTEX-A9 667MHZ 485FCBGA

MPQ: 1

Lead Time: 9-12Days

-- --
2700
Total: $
GA0603A561FBAAT31G
Vishay
CAP CER 560PF 50V C0G/NP0 0603

Lead Time: 9-12Days

-- --
3200
Total: $
XC7Z030-1FBG676C
Amd
IC SOC CORTEX-A9 667MHZ 676FCBGA

MPQ: 1

Lead Time: 9-12Days

-- --
9100
Total: $
XC7Z030-1FBG484I
Amd
IC SOC CORTEX-A9 667MHZ 484FCBGA

MPQ: 1

Lead Time: 9-12Days

-- --
6800
Total: $
MKP385336160JC02R0
Vishay
CAP FILM 0.036UF 5% 1.6KVDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
8900
Total: $
XC7Z030-1SBG485I
Amd
IC SOC CORTEX-A9 667MHZ 485FCBGA

MPQ: 1

Lead Time: 9-12Days

-- --
3500
Total: $
223PPB162K
Cornell Dubilier
CAP FILM 0.022UF 10% 1.6KVDC RAD

Lead Time: 9-12Days

-- --
6800
Total: $
GA0603A561FBAAR31G
Vishay
CAP CER 560PF 50V C0G/NP0 0603

MPQ: 10000

Lead Time: 9-12Days

-- --
8400
Total: $
XC7Z030-1FBG676I
Amd
IC SOC CORTEX-A9 667MHZ 676FCBGA

MPQ: 1

Lead Time: 9-12Days

-- --
8900
Total: $
C410C123G1G5TA
Kemet(Yageo)
CAP CER 0.012UF 100V C0G AXIAL

Lead Time: 9-12Days

-- --
300
Total: $
XC7Z030-2SBG485I
Amd
IC SOC CORTEX-A9 800MHZ 485FCBGA

MPQ: 1

Lead Time: 9-12Days

-- --
2400
Total: $
  • 1
  • 6047
  • 6048
  • 6049
  • 6050
  • 6051
  • 6670
Go to