Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
VJ0603D4R3CXPAP
Vishay
CAP CER 4.3PF 250V C0G/NP0 0603

MPQ: 10000

Lead Time: 9-12Days

-- --
6800
Total: $
P5020NSE7TNB
Nxp Semiconductors
IC MPU QORIQ P5 2.0GHZ 1295BGA

Lead Time: 9-12Days

-- --
8700
Total: $
MKP1841291134
Vishay
CAP FILM 9100PF 5% 1.6KVDC RAD

MPQ: 260

Lead Time: 9-12Days

-- --
8600
Total: $
P5020NSE7VNB
Nxp Semiconductors
IC MPU QORIQ P5 2.0GHZ 1295BGA

Lead Time: 9-12Days

-- --
4800
Total: $
VJ0603D4R3CXPAJ
Vishay
CAP CER 4.3PF 250V C0G/NP0 0603

Lead Time: 9-12Days

-- --
2300
Total: $
MKP1841247134
Vishay
CAP FILM 4700PF 5% 1.6KVDC RAD

MPQ: 260

Lead Time: 9-12Days

-- --
9400
Total: $
VJ0603D4R3CXPAC
Vishay
CAP CER 4.3PF 250V C0G/NP0 0603

Lead Time: 9-12Days

-- --
5400
Total: $
MKP1841227204
Vishay
CAP FILM 2700PF 5% 2KVDC RADIAL

MPQ: 260

Lead Time: 9-12Days

-- --
5000
Total: $
P5020NSN7TNB
Nxp Semiconductors
IC MPU QORIQ P5 2.0GHZ 1295BGA

Lead Time: 9-12Days

-- --
8400
Total: $
MKP1840433405M
Vishay
CAP FILM 0.33UF 10% 400VDC RAD

MPQ: 300

Lead Time: 9-12Days

-- --
6800
Total: $
P5020NSN7VNB
Nxp Semiconductors
IC MPU QORIQ P5 2.0GHZ 1295BGA

Lead Time: 9-12Days

-- --
7800
Total: $
P5020NXE7QMB
Nxp Semiconductors
IC MPU QORIQ P5 2.0GHZ 1295BGA

Lead Time: 9-12Days

-- --
400
Total: $
MKP1840433404M
Vishay
CAP FILM 0.33UF 5% 400VDC RADIAL

MPQ: 300

Lead Time: 9-12Days

-- --
7400
Total: $
F1778422K3FBB0
Vishay
CAP FILM 0.22UF 10% 630VDC RAD

MPQ: 325

Lead Time: 9-12Days

-- --
8000
Total: $
P5020NXN7QMB
Nxp Semiconductors
IC MPU QORIQ P5 2.0GHZ 1295BGA

Lead Time: 9-12Days

-- --
600
Total: $
BFC233450334
Vishay
CAP FILM 0.33UF 5% 400VDC RADIAL

MPQ: 750

Lead Time: 9-12Days

-- --
6000
Total: $
VJ0603D3R9CXPAP
Vishay
CAP CER 3.9PF 250V C0G/NP0 0603

MPQ: 10000

Lead Time: 9-12Days

-- --
7600
Total: $
MKP385375085JIP2T0
Vishay
CAP FILM 0.075UF 5% 850VDC RAD

MPQ: 300

Lead Time: 9-12Days

-- --
2500
Total: $
VJ0603D3R9CXPAC
Vishay
CAP CER 3.9PF 250V C0G/NP0 0603

Lead Time: 9-12Days

-- --
4200
Total: $
MCIMX6G0DVM05AA
Nxp Semiconductors
IC MPU I.MX6UL 528MHZ 289MAPBGA

Lead Time: 9-12Days

-- --
1700
Total: $
  • 1
  • 6042
  • 6043
  • 6044
  • 6045
  • 6046
  • 6670
Go to