Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SMCJ400CA/TR13
Yageo

Lead Time: 9-12Days

-- --
900
Total: $
SMCJ75CA/TR13
Yageo

Lead Time: 9-12Days

-- --
6900
Total: $
SMDJ30CA-AT/TR13
Yageo
TVS SMDJ30CA-AT/TR13 30V SMCDO-214AB

Lead Time: 9-12Days

-- --
8100
Total: $
SMCJ28CA/TR13
Yageo

Lead Time: 9-12Days

-- --
3900
Total: $
SMCJ20CA/TR13
Yageo

Lead Time: 9-12Days

-- --
6700
Total: $
SMCJ24CA-AT/TR13
Yageo

Lead Time: 9-12Days

-- --
7500
Total: $
SMCJ5.0A/TR13
Yageo

Lead Time: 9-12Days

-- --
8700
Total: $
SMCJ54CA/TR13
Yageo

Lead Time: 9-12Days

-- --
8900
Total: $
102KD20-P10
Yageo
20mm 1000V ±10%

Lead Time: 9-12Days

-- --
700
Total: $
270KD14
Yageo
14mm 27V ±10%

Lead Time: 9-12Days

-- --
500
Total: $
SET23A15L02
Yageo
ESD SET23A15L02 15V VBR=16.7,Vc=30,IPP=10A,CJ=90PF SOT-23

Lead Time: 9-12Days

-- --
4500
Total: $
UDT23A05L02
Yageo
ESD UDT23A05L02 SOT-23

Lead Time: 9-12Days

-- --
5900
Total: $
431KD10
Yageo
10mm 430V ±10%

Lead Time: 9-12Days

-- --
300
Total: $
431KD14
Yageo
14mm 430V ±10%

Lead Time: 9-12Days

-- --
9700
Total: $
4532-401-LF
Yageo
4532-401-LF 18124532 400V

Lead Time: 9-12Days

-- --
9900
Total: $
680KD14J
Yageo
14mm 68V ±10%

Lead Time: 9-12Days

-- --
9900
Total: $
SMAJ14CA/TR13
Yageo

Lead Time: 9-12Days

-- --
1500
Total: $
SMAJ16A/TR13
Yageo

Lead Time: 9-12Days

-- --
4500
Total: $
SMAJ170A/TR13
Yageo

Lead Time: 9-12Days

-- --
2100
Total: $
SMAJ33A/TR13
Yageo

Lead Time: 9-12Days

-- --
4700
Total: $
  • 1
  • 57
  • 58
  • 59
  • 60
  • 61
  • 6854
Go to