Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
X9258US24T1
Renesas
IC DGTL POT 50KOHM 256TAP 24SOIC

Lead Time: 9-12Days

-- --
7500
Total: $
BFC247935134
Vishay
CAP FILM 0.13UF 5% 160VDC RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
7700
Total: $
X9258UV24I
Renesas
IC DGT POT 50KOHM 256TAP 24TSSOP

Lead Time: 9-12Days

-- --
6700
Total: $
BFC237327125
Vishay
CAP FILM 1.2UF 10% 100VDC RADIAL

MPQ: 1100

Lead Time: 9-12Days

-- --
9500
Total: $
BFC241913003
Vishay
CAP FILM 0.03UF 2% 400VDC RADIAL

MPQ: 750

Lead Time: 9-12Days

-- --
7500
Total: $
X9259TS24I-2.7T1
Renesas
IC DGT POT 100KOHM 256TAP 24SOIC

Lead Time: 9-12Days

-- --
4100
Total: $
BFC241814703
Vishay
CAP FILM 0.047UF 2% 250VDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
5900
Total: $
X9259TS24IT1
Renesas
IC DGT POT 100KOHM 256TAP 24SOIC

Lead Time: 9-12Days

-- --
4400
Total: $
BFC241719103
Vishay
CAP FILM 0.091UF 2% 160VDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
1800
Total: $
X9259TS24IZ
Renesas
IC DGT POT 100KOHM 256TAP 24SOIC

Lead Time: 9-12Days

-- --
2800
Total: $
X9259TS24IZ-2.7
Renesas
IC DGT POT 100KOHM 256TAP 24SOIC

Lead Time: 9-12Days

-- --
4100
Total: $
BFC241711004
Vishay
CAP FILM 0.1UF 2% 160VDC RADIAL

MPQ: 750

Lead Time: 9-12Days

-- --
7400
Total: $
X9259TS24T1
Renesas
IC DGT POT 100KOHM 256TAP 24SOIC

Lead Time: 9-12Days

-- --
6700
Total: $
BFC237543242
Vishay
CAP FILM 2400PF 3.5% 2KVDC RAD

MPQ: 650

Lead Time: 9-12Days

-- --
5200
Total: $
X9259TV24
Renesas
IC DGT POT 50KOHM 256TAP 24TSSOP

Lead Time: 9-12Days

-- --
3900
Total: $
X9259TV24-2.7
Renesas
IC DGT POT 50KOHM 256TAP 24TSSOP

Lead Time: 9-12Days

-- --
1000
Total: $
X9259TV24I
Renesas
IC DGT POT 50KOHM 256TAP 24TSSOP

Lead Time: 9-12Days

-- --
6000
Total: $
MKP1841322206
Vishay
CAP FILM 0.022UF 20% 2KVDC RAD

MPQ: 125

Lead Time: 9-12Days

-- --
6500
Total: $
MKP1841322205
Vishay
CAP FILM 0.022UF 10% 2KVDC RAD

MPQ: 125

Lead Time: 9-12Days

-- --
9800
Total: $
MKP385451040JKP2T0
Vishay
CAP FILM 0.51UF 5% 400VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
5300
Total: $
  • 1
  • 5883
  • 5884
  • 5885
  • 5886
  • 5887
  • 6854
Go to