Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
BFC237351154
Vishay
CAP FILM 0.15UF 10% 400VDC RAD

MPQ: 1000

Lead Time: 9-12Days

-- --
7600
Total: $
BFC236817105
Vishay
CAP FILM 1UF 5% 63VDC RADIAL

MPQ: 2000

Lead Time: 9-12Days

-- --
4600
Total: $
BFC236816105
Vishay
CAP FILM 1UF 5% 63VDC RADIAL

MPQ: 2000

Lead Time: 9-12Days

-- --
200
Total: $
153PPB202K
Cornell Dubilier
CAP FILM 0.015UF 10% 2KVDC RAD

Lead Time: 9-12Days

-- --
5100
Total: $
BFC237019684
Vishay
CAP FILM 0.68UF 5% 63VDC RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
3600
Total: $
BFC237016684
Vishay
CAP FILM 0.68UF 5% 63VDC RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
6200
Total: $
B32562J8474K289
Tdk
CAP FILM 0.47UF 10% 2DIP

MPQ: 1900

Lead Time: 9-12Days

-- --
2400
Total: $
MKP1839433163R
Vishay
CAP FILM 0.33UF 2.5% 160VDC AXL

MPQ: 1000

Lead Time: 9-12Days

-- --
5300
Total: $
MKP1839433163
Vishay
CAP FILM 0.33UF 2.5% 160VDC AXL

MPQ: 1000

Lead Time: 9-12Days

-- --
4300
Total: $
TSW-101-10-F-D
Samtec
CONN HEADER VERT 2POS

MPQ: 1

Lead Time: 9-12Days

-- --
2600
Total: $
TSW-101-08-H-S
Samtec
CONN HEADER VERT 1POS

MPQ: 1

Lead Time: 9-12Days

-- --
8000
Total: $
TSW-101-07-H-S
Samtec
CONN HEADER VERT 1POS

MPQ: 1

Lead Time: 9-12Days

-- --
700
Total: $
TSW-101-07-F-Q
Samtec
CONN HEADER VERT 2POS

MPQ: 1

Lead Time: 9-12Days

-- --
2800
Total: $
TMM-101-05-G-S
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
5500
Total: $
TMM-101-04-G-S
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
9200
Total: $
TSM-102-01-TM-SV
Samtec
CONN HEADER SMD 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4800
Total: $
FTR-102-02-T-S
Samtec
CONN HEADER SMD 2POS 1.27MM

MPQ: 1

Lead Time: 9-12Days

-- --
5500
Total: $
TSW-102-17-F-S
Samtec
CONN HEADER VERT 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
3000
Total: $
M20-9740746
Harwin
CONN HEADER R/A 14POS 2.54MM

MPQ: 300

Lead Time: 9-12Days

-- --
0
Total: $
3210-06-001-12-00
Cnc Tech
CONN HEADER VERT 6POS 1.27MM

Lead Time: 9-12Days

-- --
8200
Total: $
  • 1
  • 5839
  • 5840
  • 5841
  • 5842
  • 5843
  • 6670
Go to