Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
68449-278HLF
Amphenol
CONN HEADER VERT 10POS 2.54MM

Lead Time: 9-12Days

-- --
500
Total: $
78511-405HALF
Amphenol
BERGSTIK II HEADER .100/

Lead Time: 9-12Days

-- --
9000
Total: $
890-18-003-10-004101
Preci-Dip
CONN HEADER VERT 3POS 2.54MM

MPQ: 2000

Lead Time: 9-12Days

-- --
7900
Total: $
643431-5
Te Connectivity
CONN HEADER VERT 4POS 2.54MM

Lead Time: 9-12Days

-- --
6400
Total: $
78511-409HLF
Amphenol
CONN HEADER VERT 9POS 2.54MM

Lead Time: 9-12Days

-- --
1000
Total: $
10129379-912004BLF
Amphenol
CONN HEADER R/A 12POS 2.54MM

Lead Time: 9-12Days

-- --
3000
Total: $
10129379-912003BLF
Amphenol
CONN HEADER R/A 12POS 2.54MM

Lead Time: 9-12Days

-- --
2600
Total: $
86130145014345E1LF
Amphenol
CONN HEADER VERT 14POS 2.54MM

Lead Time: 9-12Days

-- --
8100
Total: $
0026654020
Molex
CONN HEADER VERT 2POS 3.96MM

Lead Time: 9-12Days

-- --
6300
Total: $
0026606022
Molex
CONN HEADER VERT 2POS 3.96MM

Lead Time: 9-12Days

-- --
2000
Total: $
77311-824-07LF
Amphenol
CONN HEADER VERT 7POS 2.54MM

Lead Time: 9-12Days

-- --
800
Total: $
78208-404HLF
Amphenol
CONN HEADER R/A 4POS 2.54MM

Lead Time: 9-12Days

-- --
7200
Total: $
68000-203HALF
Amphenol
CONN HEADER VERT 3POS 2.54MM

Lead Time: 9-12Days

-- --
7700
Total: $
77315-107-04LF
Amphenol
CONN HEADER R/A 4POS 2.54MM

Lead Time: 9-12Days

-- --
3100
Total: $
5-292206-6
Te Connectivity
CONN HEADER R/A 6POS 1.5MM

Lead Time: 9-12Days

-- --
4100
Total: $
6-292172-2
Te Connectivity
CONN HEADER SMD 2POS 2MM

MPQ: 24000

Lead Time: 9-12Days

-- --
3200
Total: $
892-70-010-10-002101
Preci-Dip
CONN HEADER VERT 10POS 2.54MM

MPQ: 2250

Lead Time: 9-12Days

-- --
3000
Total: $
7-1971800-1
Te Connectivity
NEW GI CONN2.5 HDR ASMBLY 7P NC

Lead Time: 9-12Days

-- --
9800
Total: $
10146242-021NLF
Amphenol
CONN 2.5 VT TH HDR

Lead Time: 9-12Days

-- --
3400
Total: $
008263031200000+
Kyocera Avx Components
WIRE TO BOARD

Lead Time: 9-12Days

-- --
9100
Total: $
  • 1
  • 5805
  • 5806
  • 5807
  • 5808
  • 5809
  • 6670
Go to