Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SMD1812-150/33N
Bourns Inc.
/Fuse SMD1812-150/33N

Lead Time: 9-12Days

-- --
3100
Total: $
SMD1812-050/60N
Bourns Inc.

Lead Time: 9-12Days

-- --
3500
Total: $
VEJ470M1HTR-0607
Lelon Electronics Corp.
6.3mm*7.7mm 47μF ±20% 50VDC

Lead Time: 9-12Days

-- --
4900
Total: $
S9014
Bourns Inc.
BJT 200mW 45V 100mA NPN SOT-23

Lead Time: 9-12Days

-- --
9500
Total: $
SD103AX
Bourns Inc.
40V 350mA SOD-523

Lead Time: 9-12Days

-- --
8700
Total: $
TPS54140ADGQR
Texas Instruments
DC-DC 3.5V~42V 800mV~39V MSOP-10-EP

Lead Time: 9-12Days

-- --
6500
Total: $
CC0603JRX7R6BB105
Yageo
MLCC 10V ±5% 1uF X7R 0603

Lead Time: 9-12Days

-- --
500
Total: $
SJD12A12L01
Yageo
ESD SJD12A12L01 SOD-123S

Lead Time: 9-12Days

-- --
3100
Total: $
SJD12A09L01
Yageo
ESD SJD12A09L01 SOD-123S

Lead Time: 9-12Days

-- --
1700
Total: $
SMD1206B075TFT
Yageo
1206 750mA 8V

Lead Time: 9-12Days

-- --
2300
Total: $
SMD1210B110TF/12
Yageo
1210 1.1A 12V

Lead Time: 9-12Days

-- --
3700
Total: $
SMD2920B300TF/15
Yageo
2920 3A 15V

Lead Time: 9-12Days

-- --
6300
Total: $
SMD2920B500TF/16
Yageo
2920 5A

Lead Time: 9-12Days

-- --
8300
Total: $
SMD1206B075TF/13.2
Yageo
1206 750mA 13.2V

Lead Time: 9-12Days

-- --
4900
Total: $
SMD1210B150TFT
Yageo
1210 100A 6V

Lead Time: 9-12Days

-- --
5300
Total: $
SMCJ24CA/TR13
Yageo

Lead Time: 9-12Days

-- --
5700
Total: $
SMD2920B075TF
Yageo
2920 750mA 30V

Lead Time: 9-12Days

-- --
6500
Total: $
SMBJ22A/TR13
Yageo

Lead Time: 9-12Days

-- --
100
Total: $
SMBJ200A/TR13
Yageo

Lead Time: 9-12Days

-- --
5100
Total: $
SMBJ75CA/TR13
Yageo
TVS SMBJ75CA/TR13 75V SMBDO-214AA

Lead Time: 9-12Days

-- --
9300
Total: $
  • 1
  • 56
  • 57
  • 58
  • 59
  • 60
  • 6854
Go to