Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
3-1123723-1
Te Connectivity
CONN HEADER VERT 11POS 3.96MM

Lead Time: 9-12Days

-- --
3500
Total: $
6-1123723-1
Te Connectivity
CONN HEADER VERT 11POS 3.96MM

Lead Time: 9-12Days

-- --
8700
Total: $
2-1123723-1
Te Connectivity
CONN HEADER VERT 11POS 3.96MM

Lead Time: 9-12Days

-- --
500
Total: $
10136647-042121LF
Amphenol
CONN PWR4.2 VT HEADER

Lead Time: 9-12Days

-- --
8700
Total: $
10136647-042122LF
Amphenol
CONN PWR4.2 VT HEADER

Lead Time: 9-12Days

-- --
7800
Total: $
10137785-032132LF
Amphenol
CONN PWR4.2 HCC VT

Lead Time: 9-12Days

-- --
6400
Total: $
10137785-032231LF
Amphenol
CONN PWR4.2 HCC VT

Lead Time: 9-12Days

-- --
5200
Total: $
10137785-032142LF
Amphenol
CONN PWR4.2 HCC VT

Lead Time: 9-12Days

-- --
2900
Total: $
10137785-032141LF
Amphenol
CONN PWR4.2 HCC VT

Lead Time: 9-12Days

-- --
9500
Total: $
10137785-032232LF
Amphenol
CONN PWR4.2 HCC VT

Lead Time: 9-12Days

-- --
5500
Total: $
10137785-032241LF
Amphenol
CONN PWR4.2 HCC VT

Lead Time: 9-12Days

-- --
3100
Total: $
10137785-032242LF
Amphenol
CONN HEADER VERT 3POS 4.2MM

Lead Time: 9-12Days

-- --
9700
Total: $
800-10-003-10-002101
Preci-Dip
CONN HEADER VERT 3POS 2.54MM

MPQ: 4000

Lead Time: 9-12Days

-- --
8200
Total: $
0022045088
Molex
CONN HEADER VERT 8POS 2.54MM

Lead Time: 9-12Days

-- --
4500
Total: $
0022045086
Molex
CONN HEADER VERT 8POS 2.54MM

Lead Time: 9-12Days

-- --
800
Total: $
0022045085
Molex
CONN HEADER VERT 8POS 2.54MM

Lead Time: 9-12Days

-- --
400
Total: $
0022045084
Molex
CONN HEADER VERT 8POS 2.54MM

Lead Time: 9-12Days

-- --
6400
Total: $
0022045082
Molex
CONN HEADER VERT 8POS 2.54MM

Lead Time: 9-12Days

-- --
5900
Total: $
0022045081
Molex
CONN HEADER VERT 8POS 2.54MM

Lead Time: 9-12Days

-- --
9300
Total: $
5-104608-4
Te Connectivity
CONN HEADER VERT 4POS 2.54MM

Lead Time: 9-12Days

-- --
6600
Total: $
  • 1
  • 5752
  • 5753
  • 5754
  • 5755
  • 5756
  • 6670
Go to