Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MPC8343CVRAGD
Nxp Semiconductors
IC MPU MPC83XX 400MHZ 620HBGA

Lead Time: 9-12Days

-- --
6800
Total: $
BFC247942114
Vishay
CAP FILM 0.11UF 5% 250VDC RADIAL

MPQ: 1500

Lead Time: 9-12Days

-- --
2100
Total: $
MPC8343CZQADD
Nxp Semiconductors
IC MPU MPC83XX 266MHZ 620HBGA

Lead Time: 9-12Days

-- --
600
Total: $
BFC246817474
Vishay
CAP FILM 0.47UF 5% 250VDC RADIAL

MPQ: 1500

Lead Time: 9-12Days

-- --
7800
Total: $
BFC238554332
Vishay
CAP FILM 3300PF 5% 1.6KVDC RAD

MPQ: 1000

Lead Time: 9-12Days

-- --
8000
Total: $
MPC8343EVRADD
Nxp Semiconductors
IC MPU MPC83XX 266MHZ 620HBGA

Lead Time: 9-12Days

-- --
9700
Total: $
BFC238550822
Vishay
CAP FILM 8200PF 5% 1.6KVDC RAD

MPQ: 1250

Lead Time: 9-12Days

-- --
5200
Total: $
MPC8343VRADD
Nxp Semiconductors
IC MPU MPC83XX 266MHZ 620HBGA

Lead Time: 9-12Days

-- --
0
Total: $
B32524Q8105J000
Tdk
CAP FILM 1UF 5% 630VDC RADIAL

MPQ: 1040

Lead Time: 9-12Days

-- --
2000
Total: $
MPC8343VRAGD
Nxp Semiconductors
IC MPU MPC83XX 400MHZ 620HBGA

Lead Time: 9-12Days

-- --
900
Total: $
F339X141548KI02W0
Vishay
CAP FILM 0.15UF 10% 1KVDC RADIAL

MPQ: 450

Lead Time: 9-12Days

-- --
1500
Total: $
ECW-F6164HLB
Panasonic
CAP FILM 0.16UF 3% 630VDC RADIAL

Lead Time: 9-12Days

-- --
8800
Total: $
MPC8347CVRAGD
Nxp Semiconductors
IC MPU MPC83XX 400MHZ 620HBGA

Lead Time: 9-12Days

-- --
4400
Total: $
ECW-H12433RHV
Panasonic
CAP FILM 0.043UF 3% 1.25KVDC RAD

MPQ: 300

Lead Time: 9-12Days

-- --
5700
Total: $
MPC8347ECVRAGD
Nxp Semiconductors
IC MPU MPC83XX 400MHZ 620HBGA

Lead Time: 9-12Days

-- --
4500
Total: $
ECW-H12393RHV
Panasonic
CAP FILM 0.039UF 3% 1.25KVDC RAD

MPQ: 300

Lead Time: 9-12Days

-- --
0
Total: $
MKP1841433254
Vishay
CAP FILM 0.33UF 5% 250VDC RADIAL

MPQ: 200

Lead Time: 9-12Days

-- --
3900
Total: $
MPC8347EVRAGD
Nxp Semiconductors
IC MPU MPC83XX 400MHZ 620HBGA

Lead Time: 9-12Days

-- --
4400
Total: $
BFC233848109
Vishay
CAP FILM 0.22UF 20% 800VDC RAD

MPQ: 200

Lead Time: 9-12Days

-- --
1600
Total: $
MPC8347EVVAJD
Nxp Semiconductors
IC MPU MPC83XX 533MHZ 672LBGA

Lead Time: 9-12Days

-- --
6100
Total: $
  • 1
  • 5639
  • 5640
  • 5641
  • 5642
  • 5643
  • 6670
Go to