Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
DS1337C/T&R
Analog Devices
IC RTC CLK/CALENDAR I2C 16SOIC

Lead Time: 9-12Days

-- --
6700
Total: $
C1210C123K2RACTU
Kemet(Yageo)
CAP CER 0.012UF 200V X7R 1210

MPQ: 4000

Lead Time: 9-12Days

-- --
8400
Total: $
DS1339C-33
Analog Devices
IC RTC CLK/CALENDAR I2C 16SOIC

Lead Time: 9-12Days

-- --
1700
Total: $
DS1391U-33
Analog Devices
IC RTC CLK/CALENDAR SPI 10UMAX

Lead Time: 9-12Days

-- --
3200
Total: $
C1206C362K5GACTU
Kemet(Yageo)
CAP CER 3600PF 50V C0G/NP0 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
3500
Total: $
DS1682S/T&R
Analog Devices
IC RTC ELAPSED CNT I2C 8SOIC

Lead Time: 9-12Days

-- --
6200
Total: $
1337GDCGI
Renesas
IC RTC CLK/CALENDAR I2C 8SOIC

Lead Time: 9-12Days

-- --
8800
Total: $
C0603C100C2GACTU
Kemet(Yageo)
CAP CER 10PF 200V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
7100
Total: $
SA111C223KAR
Kyocera Avx Components
CAP CER 0.022UF 100V X7R AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
8200
Total: $
1337GDCGI8
Renesas
IC RTC CLK/CALENDAR I2C 8SOIC

Lead Time: 9-12Days

-- --
7900
Total: $
1337GDVGI
Renesas
IC RTC CLK/CALENDAR I2C 8MSOP

Lead Time: 9-12Days

-- --
2700
Total: $
1337GDVGI8
Renesas
IC RTC CLK/CALENDAR I2C 8MSOP

Lead Time: 9-12Days

-- --
1200
Total: $
SA111C223KAA
Kyocera Avx Components
CAP CER 0.022UF 100V X7R AXIAL

Lead Time: 9-12Days

-- --
9500
Total: $
1337GNLGI
Renesas
IC RTC CLK/CALENDAR I2C 16QFN

Lead Time: 9-12Days

-- --
7800
Total: $
1337GNLGI8
Renesas
IC RTC CLK/CALENDAR I2C 16QFN

Lead Time: 9-12Days

-- --
3900
Total: $
SA101C223KARC
Kyocera Avx Components
CAP CER 0.022UF 100V X7R AXIAL

MPQ: 4000

Lead Time: 9-12Days

-- --
7400
Total: $
1337GCSRI
Renesas
IC RTC CLK/CALENDAR I2C 16SOIC

Lead Time: 9-12Days

-- --
5500
Total: $
1337GCSRI8
Renesas
IC RTC CLK/CALENDAR I2C 16SOIC

Lead Time: 9-12Days

-- --
7700
Total: $
1338C-18SRI
Renesas
IC RTC CLK/CALENDAR I2C 16-SOIC

Lead Time: 9-12Days

-- --
5800
Total: $
1338C-18SRI8
Renesas
IC RTC CLK/CALENDAR I2C 16SOIC

Lead Time: 9-12Days

-- --
2300
Total: $
  • 1
  • 5534
  • 5535
  • 5536
  • 5537
  • 5538
  • 6854
Go to