Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
LQW15AN62NG00D
Murata
1.82Ω 62nH ±2% 145mA

Lead Time: 9-12Days

-- --
9100
Total: $
LQG15HS12NG02D
Murata
280mΩ 12nH ±2% 500mA

Lead Time: 9-12Days

-- --
700
Total: $
LQG15HS1N3B02D
Murata
FIXED

Lead Time: 9-12Days

-- --
2100
Total: $
LQG15HS15NG02D
Murata
320mΩ 15nH ±2% 450mA

Lead Time: 9-12Days

-- --
2700
Total: $
LQW15AN2N9B00D
Murata
70mΩ 2.9nH 750mA

Lead Time: 9-12Days

-- --
1700
Total: $
LQP03TN18NH02D
Murata
800mΩ 18nH ±3% 200mA

Lead Time: 9-12Days

-- --
8900
Total: $
LQP03TGR10J02D
Murata
8.05Ω 100nH ±5% 80mA

Lead Time: 9-12Days

-- --
6300
Total: $
WSL2010R5000FEA18
Vishay
1W 500mΩ ±75ppm/℃ ±1%

Lead Time: 9-12Days

-- --
4700
Total: $
GRM0335C1HR30WA01D
Murata
MLCC 50V 0.3pF C0G

Lead Time: 9-12Days

-- --
1900
Total: $
GRM0335C1H270GA01D
Murata
Capacitor: ceramic; MLCC; 27pF; 50V; C0G (NP0); ±2%; SMD;

Lead Time: 9-12Days

-- --
6500
Total: $
GRM0335C1H4R7CA01D
Murata
MLCC 50V 4.7pF C0G

Lead Time: 9-12Days

-- --
8500
Total: $
GRM0335C1H300JA01D
Murata
Capacitor: ceramic; MLCC; 30pF; 50V; C0G (NP0); ±5%; SMD;

Lead Time: 9-12Days

-- --
100
Total: $
GRM0335C1H5R6BA01D
Murata
MLCC 50V 5.6pF C0G

Lead Time: 9-12Days

-- --
8100
Total: $
GJM1555C1H2R4BB01D
Murata
MLCC 50V 2.4pF C0G

Lead Time: 9-12Days

-- --
300
Total: $
SMBJ15A/TR13
Yageo

Lead Time: 9-12Days

-- --
5300
Total: $
GCM1885C2A470JA16D
Murata
MLCC 100V ±5% 47pF C0G

Lead Time: 9-12Days

-- --
5500
Total: $
JK-SMD0805-020-30V
Jinke
JK-SMD0805-020-30V 0805

Lead Time: 9-12Days

-- --
4300
Total: $
0805W8F120KT5E
Uni-Royal
0805 1.2Ω ±1%

Lead Time: 9-12Days

-- --
1700
Total: $
BLM03AG102SN1D
Murata
1kΩ@100MHz 2.5Ω ±25% 100mA

Lead Time: 9-12Days

-- --
6100
Total: $
BLM18BD121SN1D
Murata
120Ω@100MHz 400mΩ ±25% 300mA

Lead Time: 9-12Days

-- --
2900
Total: $
  • 1
  • 549
  • 550
  • 551
  • 552
  • 553
  • 6854
Go to